Abutment quantity calculation

교대 수량산출옵션에서 인접교대수량공제를 우측이든 좌측이든 적용하면 수량이 어떻게 반영되는지 알고 싶습니다. 답변부탁드립니다. 수고하세여

Answer

안녕하세요. 한길아이티입니다. 인접교대 수량공제를 선택하시는 경우 교대측면의 거푸집이 제외되며 스티로폼이 설정이 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196562Left wing wall at end point122005-12-03
AnsweredAAbutPier#196560Drawings cannot be output82005-12-03
AnsweredAAbutPier#196549Question about calculation report172005-12-02
AnsweredAAbutPier#196556Backfill142005-12-02
AnsweredAAbutPier#196554Material schedule does not run172005-12-02
AnsweredAAbutPier#196535Follow-up on phone inquiry172005-12-02
AnsweredAAbutPier#196533Ground line display at start abutment242005-12-02
AnsweredAAbutPier#196532Pier bearing seat step depending on superstructure type...312005-12-02
AnsweredAAbutPier#196531Pier tie rebar error322005-12-02
AnsweredAAbutPier#196529Foundation reinforcement drawing572005-12-02
AnsweredAAbutPier#196525Please check bridge maintenance signboard (quantity)722005-12-02
AnsweredAAbutPier#196524Application error112005-12-01
AnsweredAAbutPier#196518Question about wind load input142005-12-01
AnsweredAAbutPier#196512Steel pipe pile stress and bearing support length512005-12-01
AnsweredAAbutPier#196536Elevation step342005-12-01
AnsweredAAbutPier#196521Bridge bearing block322005-12-01
AnsweredAAbutPier#196500About drawings212005-12-01
AnsweredAAbutPier#196498Quantity report not generated; message says to contact HanGil IT152005-12-01
AnsweredAAbutPier#196494Applying levels252005-11-30
AnsweredAAbutPier#196505Abutment quantity calculation · Currently viewing232005-11-30
Sign in to ask