Coefficient of horizontal subgrade reaction
기초부의 지지력등의 검토는 지반부에서 검토를 하는 추세인데 지반부에서는 수평지반반력을 kg/cm3단위로 계산해서 전달해주므로 현 APIER에서는 N치로만 산정하도록 되어있어 계산서 수정을 하려면 시간이 많이 걸립니다. 그래서 APIER도 ACULVERT처럼 강재입력이 가능하도록 수정해 주시면 감사하겠습니다.
Answer
안녕하세요. 한길아이티입니다. 말씀하신 사항은 보완하여 금일자 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196189 | Cross tie rebar quantity error | 14 | 2005-11-18 |
| Answered | AAbutPier | #196184 | Distance from parapet to shoe center | 28 | 2005-11-18 |
| Answered | AAbutPier | #196181 | Seismic pile reactions in pier foundation design with cast-in-place piles | 39 | 2005-11-18 |
| Answered | AAbutPier | #196170 | Column design for a sway (unbraced) structure | 50 | 2005-11-18 |
| Answered | AAbutPier | #196183 | Pile load test quantity | 29 | 2005-11-18 |
| Answered | AAbutPier | #196182 | Coefficient of horizontal subgrade reaction · Currently viewing | 31 | 2005-11-18 |
| Answered | AAbutPier | #196179 | When changing rebar details | 38 | 2005-11-18 |
| Answered | AAbutPier | #196174 | Changing main rebar to two layers | 65 | 2005-11-18 |
| Answered | AAbutPier | #196161 | Temperature load calculation for pier at expansion joint seems wrong | 90 | 2005-11-18 |
| Answered | AAbutPier | #196158 | Drawing generation | 53 | 2005-11-18 |
| Answered | AAbutPier | #196155 | Pier bearing seat location mismatch | 35 | 2005-11-18 |
| Answered | AAbutPier | #196152 | Follow-up to phone inquiry | 68 | 2005-11-18 |
| Answered | AAbutPier | #196150 | About the stability index | 63 | 2005-11-18 |
| Answered | AAbutPier | #196149 | Shoe tonnage is entered incorrectly | 89 | 2005-11-18 |
| Answered | AAbutPier | #196142 | Additional question on 18970 | 64 | 2005-11-18 |
| Answered | AAbutPier | #196140 | About the left wing wall reinforcement drawing of the abutment | 71 | 2005-11-18 |
| Answered | AAbutPier | #196129 | Spread footing thickness check | 48 | 2005-11-17 |
| Answered | AAbutPier | #196163 | Rounding the bottom of the coping end | 11 | 2005-11-17 |
| Answered | AAbutPier | #196135 | Number of bearings per girder | 70 | 2005-11-17 |
| Answered | AAbutPier | #196121 | Cast-in-place pile rebar ratio | 59 | 2005-11-17 |