기둥은 일반적으로 하단의 단면적이 가장 크고 높이에 따라 감소함. 따라서 축방향 주철근이 2단으로 배근된 기둥의 경우에는 내측에 설치된 철근의 필요구간을 검토하고 필요한 구간까지 배근하도록하는 방안을 검토하기 바람. 조치사항은 첨부된 액셀로 검토하였습니다.

Answer

안녕하세요. 한길아이티입니다. 말씀하시 내용은 검토후 보완하여 패치에 적용하도록 하겠습니다. 작업일정은 바로 적용하기는 어려우며 가급적이면 11월30일 이전에 적용되도록 하겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196189Cross tie rebar quantity error142005-11-18
AnsweredAAbutPier#196184Distance from parapet to shoe center282005-11-18
AnsweredAAbutPier#196181Seismic pile reactions in pier foundation design with cast-in-place piles392005-11-18
AnsweredAAbutPier#196170Column design for a sway (unbraced) structure502005-11-18
AnsweredAAbutPier#196183Pile load test quantity292005-11-18
AnsweredAAbutPier#196182Coefficient of horizontal subgrade reaction312005-11-18
AnsweredAAbutPier#196179When changing rebar details382005-11-18
AnsweredAAbutPier#196174Changing main rebar to two layers · Currently viewing652005-11-18
AnsweredAAbutPier#196161Temperature load calculation for pier at expansion joint seems wrong902005-11-18
AnsweredAAbutPier#196158Drawing generation532005-11-18
AnsweredAAbutPier#196155Pier bearing seat location mismatch352005-11-18
AnsweredAAbutPier#196152Follow-up to phone inquiry682005-11-18
AnsweredAAbutPier#196150About the stability index632005-11-18
AnsweredAAbutPier#196149Shoe tonnage is entered incorrectly892005-11-18
AnsweredAAbutPier#196142Additional question on 18970642005-11-18
AnsweredAAbutPier#196140About the left wing wall reinforcement drawing of the abutment712005-11-18
AnsweredAAbutPier#196129Spread footing thickness check482005-11-17
AnsweredAAbutPier#196163Rounding the bottom of the coping end112005-11-17
AnsweredAAbutPier#196135Number of bearings per girder702005-11-17
AnsweredAAbutPier#196121Cast-in-place pile rebar ratio592005-11-17
Sign in to ask