Follow-up to phone inquiry
전화로문의드린내용입니다
Answer
안녕하세요. 한길아이티입니다. 패치과정에서 오류가 있었습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 패치는 금일 18:00에 올라갈 예정입니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196189 | Cross tie rebar quantity error | 14 | 2005-11-18 |
| Answered | AAbutPier | #196184 | Distance from parapet to shoe center | 28 | 2005-11-18 |
| Answered | AAbutPier | #196181 | Seismic pile reactions in pier foundation design with cast-in-place piles | 39 | 2005-11-18 |
| Answered | AAbutPier | #196170 | Column design for a sway (unbraced) structure | 50 | 2005-11-18 |
| Answered | AAbutPier | #196183 | Pile load test quantity | 29 | 2005-11-18 |
| Answered | AAbutPier | #196182 | Coefficient of horizontal subgrade reaction | 31 | 2005-11-18 |
| Answered | AAbutPier | #196179 | When changing rebar details | 38 | 2005-11-18 |
| Answered | AAbutPier | #196174 | Changing main rebar to two layers | 65 | 2005-11-18 |
| Answered | AAbutPier | #196161 | Temperature load calculation for pier at expansion joint seems wrong | 90 | 2005-11-18 |
| Answered | AAbutPier | #196158 | Drawing generation | 53 | 2005-11-18 |
| Answered | AAbutPier | #196155 | Pier bearing seat location mismatch | 35 | 2005-11-18 |
| Answered | AAbutPier | #196152 | Follow-up to phone inquiry · Currently viewing | 68 | 2005-11-18 |
| Answered | AAbutPier | #196150 | About the stability index | 63 | 2005-11-18 |
| Answered | AAbutPier | #196149 | Shoe tonnage is entered incorrectly | 89 | 2005-11-18 |
| Answered | AAbutPier | #196142 | Additional question on 18970 | 64 | 2005-11-18 |
| Answered | AAbutPier | #196140 | About the left wing wall reinforcement drawing of the abutment | 71 | 2005-11-18 |
| Answered | AAbutPier | #196129 | Spread footing thickness check | 48 | 2005-11-17 |
| Answered | AAbutPier | #196163 | Rounding the bottom of the coping end | 11 | 2005-11-17 |
| Answered | AAbutPier | #196135 | Number of bearings per girder | 70 | 2005-11-17 |
| Answered | AAbutPier | #196121 | Cast-in-place pile rebar ratio | 59 | 2005-11-17 |