About the left wing wall reinforcement drawing of the abutment
우측 날개벽은 배근도가 나오는데 좌측 날개벽 연직 철근이 배근되지 않습니다. APIER에서 좌측 날개벽 철근 상세부분이 활성되지 않습니다. 조건은 우측날개벽과 동일한데..원인을 모르겠습니다. 검토좀 해주세요 [개인정보]
Answer
안녕하세요. 한길아이티입니다. [교대입력]-[철근제원]에서 해당 날개벽에 대하여 권고안 후에 확인하시면 됩니다. 좌측날개벽에 대한 부분도 권고안을 하여주시기 바랍니다. (헌치철근등이 잘못 설정되어 있는 것 같습니다.) 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196189 | Cross tie rebar quantity error | 14 | 2005-11-18 |
| Answered | AAbutPier | #196184 | Distance from parapet to shoe center | 28 | 2005-11-18 |
| Answered | AAbutPier | #196181 | Seismic pile reactions in pier foundation design with cast-in-place piles | 39 | 2005-11-18 |
| Answered | AAbutPier | #196170 | Column design for a sway (unbraced) structure | 50 | 2005-11-18 |
| Answered | AAbutPier | #196183 | Pile load test quantity | 29 | 2005-11-18 |
| Answered | AAbutPier | #196182 | Coefficient of horizontal subgrade reaction | 31 | 2005-11-18 |
| Answered | AAbutPier | #196179 | When changing rebar details | 38 | 2005-11-18 |
| Answered | AAbutPier | #196174 | Changing main rebar to two layers | 65 | 2005-11-18 |
| Answered | AAbutPier | #196161 | Temperature load calculation for pier at expansion joint seems wrong | 90 | 2005-11-18 |
| Answered | AAbutPier | #196158 | Drawing generation | 53 | 2005-11-18 |
| Answered | AAbutPier | #196155 | Pier bearing seat location mismatch | 35 | 2005-11-18 |
| Answered | AAbutPier | #196152 | Follow-up to phone inquiry | 68 | 2005-11-18 |
| Answered | AAbutPier | #196150 | About the stability index | 63 | 2005-11-18 |
| Answered | AAbutPier | #196149 | Shoe tonnage is entered incorrectly | 89 | 2005-11-18 |
| Answered | AAbutPier | #196142 | Additional question on 18970 | 64 | 2005-11-18 |
| Answered | AAbutPier | #196140 | About the left wing wall reinforcement drawing of the abutment · Currently viewing | 71 | 2005-11-18 |
| Answered | AAbutPier | #196129 | Spread footing thickness check | 48 | 2005-11-17 |
| Answered | AAbutPier | #196163 | Rounding the bottom of the coping end | 11 | 2005-11-17 |
| Answered | AAbutPier | #196135 | Number of bearings per girder | 70 | 2005-11-17 |
| Answered | AAbutPier | #196121 | Cast-in-place pile rebar ratio | 59 | 2005-11-17 |