Spread footing thickness check
교대 계산서의 확대기초 두께에 대한 강체 검토에서 헌치가 있는 확대기초의 평균두께(h) 산정시 낮은쪽의 높이로 산정되어 NG가 발생하고 있습니다 프로그램상에서 헌치를 고려하지 못하고 있는것 같습니다 검토부탁드립니다
Answer
안녕하세요. 한길아이티입니다. 강체검토시의 두께는 설계기준상 평균높이를 적용하도록 되어 있습니다. 보내주신 단면의 경우 앞굽위치에서만 경사로 처리되어 응력검토위치의 단면두께를 적용하여도 무방하리라 판단이 됩니다. 두께적용에 대한 부분은 수정하여 금일자 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #196189 | Cross tie rebar quantity error | 14 | 2005-11-18 |
| Answered | AAbutPier | #196184 | Distance from parapet to shoe center | 28 | 2005-11-18 |
| Answered | AAbutPier | #196181 | Seismic pile reactions in pier foundation design with cast-in-place piles | 39 | 2005-11-18 |
| Answered | AAbutPier | #196170 | Column design for a sway (unbraced) structure | 50 | 2005-11-18 |
| Answered | AAbutPier | #196183 | Pile load test quantity | 29 | 2005-11-18 |
| Answered | AAbutPier | #196182 | Coefficient of horizontal subgrade reaction | 31 | 2005-11-18 |
| Answered | AAbutPier | #196179 | When changing rebar details | 38 | 2005-11-18 |
| Answered | AAbutPier | #196174 | Changing main rebar to two layers | 65 | 2005-11-18 |
| Answered | AAbutPier | #196161 | Temperature load calculation for pier at expansion joint seems wrong | 90 | 2005-11-18 |
| Answered | AAbutPier | #196158 | Drawing generation | 53 | 2005-11-18 |
| Answered | AAbutPier | #196155 | Pier bearing seat location mismatch | 35 | 2005-11-18 |
| Answered | AAbutPier | #196152 | Follow-up to phone inquiry | 68 | 2005-11-18 |
| Answered | AAbutPier | #196150 | About the stability index | 63 | 2005-11-18 |
| Answered | AAbutPier | #196149 | Shoe tonnage is entered incorrectly | 89 | 2005-11-18 |
| Answered | AAbutPier | #196142 | Additional question on 18970 | 64 | 2005-11-18 |
| Answered | AAbutPier | #196140 | About the left wing wall reinforcement drawing of the abutment | 71 | 2005-11-18 |
| Answered | AAbutPier | #196129 | Spread footing thickness check · Currently viewing | 48 | 2005-11-17 |
| Answered | AAbutPier | #196163 | Rounding the bottom of the coping end | 11 | 2005-11-17 |
| Answered | AAbutPier | #196135 | Number of bearings per girder | 70 | 2005-11-17 |
| Answered | AAbutPier | #196121 | Cast-in-place pile rebar ratio | 59 | 2005-11-17 |