Skip to content
AnsweredAAbutPierQ&A #1961212005-11-17 10:08 · Views 59

Cast-in-place pile rebar ratio

현재 Apier에서 현장타설말뚝 단면검토시 최소철근비 1%, 최대철근비 8% 를 이용합니다. 각각 0.4%, 6%로 수정하여주시기 바랍니다.(도설기 5.8.12.3 참고)

Answer

안녕하세요. 한길아이티입니다. 말씀하신 사항은 확인하였습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196189Cross tie rebar quantity error142005-11-18
AnsweredAAbutPier#196184Distance from parapet to shoe center282005-11-18
AnsweredAAbutPier#196181Seismic pile reactions in pier foundation design with cast-in-place piles392005-11-18
AnsweredAAbutPier#196170Column design for a sway (unbraced) structure502005-11-18
AnsweredAAbutPier#196183Pile load test quantity292005-11-18
AnsweredAAbutPier#196182Coefficient of horizontal subgrade reaction312005-11-18
AnsweredAAbutPier#196179When changing rebar details382005-11-18
AnsweredAAbutPier#196174Changing main rebar to two layers652005-11-18
AnsweredAAbutPier#196161Temperature load calculation for pier at expansion joint seems wrong902005-11-18
AnsweredAAbutPier#196158Drawing generation532005-11-18
AnsweredAAbutPier#196155Pier bearing seat location mismatch352005-11-18
AnsweredAAbutPier#196152Follow-up to phone inquiry682005-11-18
AnsweredAAbutPier#196150About the stability index632005-11-18
AnsweredAAbutPier#196149Shoe tonnage is entered incorrectly892005-11-18
AnsweredAAbutPier#196142Additional question on 18970642005-11-18
AnsweredAAbutPier#196140About the left wing wall reinforcement drawing of the abutment712005-11-18
AnsweredAAbutPier#196129Spread footing thickness check482005-11-17
AnsweredAAbutPier#196163Rounding the bottom of the coping end112005-11-17
AnsweredAAbutPier#196135Number of bearings per girder702005-11-17
AnsweredAAbutPier#196121Cast-in-place pile rebar ratio · Currently viewing592005-11-17
Sign in to ask