ELEVATION calculation

업데이트 후 엘리베이션 산출이 좀 이상합니다. 첨부파일 ELEVATION 산출근거도 왜관방향 A1 ①번을 보면 94.204(거더EL)-1.750(거더높이)-0.169(교량받침높이)-0.050(MORTAR두께)-0.181(BLOCK두께)=92.054(교좌면EL)가 나와야 하나 92.055가 나오네요. 확인바랍니다. 기존에 높이10.000m로 되어있던 교대가 9.999m로 나오네요

Answer

안녕하세요. 한길아이티입니다. 반올림이 합하여 질 경우 소수점 자리 반올림에서 오류가 있었습니다. 이전에는 이 반올림을 조정하였는데, 더 정확하게 한다는 것이 실제 설계와는 맞지않았습니다. 수정하였습니다. 19시 패치에 올리겠습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#196119About pier support number error562005-11-17
AnsweredAAbutPier#196118Problem when modeling a pier682005-11-17
AnsweredAAbutPier#196117EL. and tie bar details482005-11-17
AnsweredAAbutPier#196106ELEVATION calculation · Currently viewing252005-11-17
AnsweredAAbutPier#196102A question about pier calculation632005-11-16
AnsweredAAbutPier#196098Reinforcement drawing672005-11-16
AnsweredAAbutPier#196097Quantity calculation error872005-11-16
AnsweredAAbutPier#196094Data file342005-11-16
AnsweredAAbutPier#196090Entering median position on a skewed span bridge392005-11-16
AnsweredAAbutPier#196089Bridge bearing capacity662005-11-16
AnsweredAAbutPier#196084Quantity report and seismic errors652005-11-16
AnsweredAAbutPier#196083Pile reactions in foundation check for pile foundations222005-11-16
AnsweredAAbutPier#196101Question on entering pier loads452005-11-16
AnsweredAAbutPier#196087Cannot adjust column position of rigid-frame pier312005-11-16
AnsweredAAbutPier#196073When checking abutment wall462005-11-16
AnsweredAAbutPier#196072Applying moment magnification factor452005-11-16
AnsweredAAbutPier#196071Showing pile locations on front view222005-11-16
AnsweredAAbutPier#196069Cross beam and step input152005-11-16
AnsweredAAbutPier#196067***312005-11-15
AnsweredAAbutPier#196066Please review422005-11-15
Sign in to ask