Skip to content
AnsweredAAbutPierQ&A #1955152005-10-21 06:36 · Views 17

Wing wall haunch

날개벽 헌치철근이 빠져있는데요.... 부탁 드립니다.

Answer

안녕하세요. 한길아이티입니다. A1의 좌측 및 우측날개벽에 대하여 수평헌치가 집계에서 누락되어 있습니다. [교대입력]-[철근제원]에서 해당 날개벽에 대하여 권고안을 하신 후에 확인하시면 이상이 없습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#195538Two layers of wing wall main rebar152005-10-23
AnsweredAAbutPier#195532Insufficient virtual memory error and existing data cannot be opened242005-10-22
AnsweredAAbutPier#195530About the pier...242005-10-22
AnsweredAAbutPier#195526Rebar quantity issue172005-10-22
AnsweredAAbutPier#195537Earthwork quantity calculation error192005-10-21
AnsweredAAbutPier#195523Pier modeling242005-10-21
AnsweredAAbutPier#195517When importing an ARoad brx file...292005-10-21
AnsweredAAbutPier#195515Wing wall haunch · Currently viewing172005-10-21
AnsweredAAbutPier#195513When checking the bridge bearing area182005-10-21
AnsweredAAbutPier#195511Abutment reinforcement drawing192005-10-21
AnsweredAAbutPier#195509When creating the bridge bearing layout drawing312005-10-21
AnsweredAAbutPier#195506Internal application error332005-10-21
AnsweredAAbutPier#195500Abutment reinforcement detailing looks wrong452005-10-21
AnsweredAAbutPier#195495Pier general quantities582005-10-21
AnsweredAAbutPier#195487Wing wall quantities512005-10-20
AnsweredAAbutPier#195508Detail "A" not shown in abutment general drawing322005-10-20
AnsweredAAbutPier#195501No piles in wing wall foundation222005-10-20
AnsweredAAbutPier#195496Coping shape432005-10-20
AnsweredAAbutPier#195486Allowable stress reduction ratio for pile splices512005-10-20
AnsweredAAbutPier#195485N.G still occurs in foundation settings382005-10-20
Sign in to ask