Seismic analysis data error
내진 해석을 위해 sap2000을 실행하면 데이타에 오류가 있다고 합니다. 어디서 발생했는지..원인을 알수가 없네요^^ 화일 함께 올립니다. 검토 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. [내진해석단면입력],[내진해석 가로보 설정]에서 단면특성이 모두 누락되어 있습니다. PF빔의 경우 자동계산부분이 적용이 되지않고 있어 "단면상수 사용자입력"으로 값을 설정하여 주셔야 합니다. 특성치에 대한 값을 입력하신 후에 확인하시면 이상이 없습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #195158 | Moving box | 45 | 2005-10-07 |
| Answered | AAbutPier | #195157 | EL values are correct but the section shape is wrong | 83 | 2005-10-07 |
| Answered | AAbutPier | #195156 | Bearings missing from general drawing, please check | 101 | 2005-10-07 |
| Answered | AAbutPier | #195149 | Cannot set cross beams in seismic analysis | 70 | 2005-10-07 |
| Answered | AAbutPier | #195143 | Please check abutment front view, delivery is imminent | 53 | 2005-10-07 |
| Answered | AAbutPier | #195139 | Abutment plan view looks wrong | 26 | 2005-10-06 |
| Answered | AAbutPier | #195134 | Error when calculating general quantities | 23 | 2005-10-06 |
| Answered | AAbutPier | #195123 | Earthwork calculation and shoe layout for separated up/down-line bridge | 63 | 2005-10-06 |
| Answered | AAbutPier | #195121 | Seismic analysis data error · Currently viewing | 29 | 2005-10-06 |
| Answered | AAbutPier | #195117 | Drawing dimension error | 27 | 2005-10-06 |
| Answered | AAbutPier | #195113 | Drawing output error | 68 | 2005-10-06 |
| Answered | AAbutPier | #195150 | In a skewed bridge | 72 | 2005-10-06 |
| Answered | AAbutPier | #195126 | Rebar marking | 61 | 2005-10-06 |
| Answered | AAbutPier | #195118 | Entered bearing coordinates, please check | 52 | 2005-10-06 |
| Answered | AAbutPier | #195111 | SAP2000 error | 85 | 2005-10-06 |
| Answered | AAbutPier | #195108 | Quantity calculation | 63 | 2005-10-06 |
| Answered | AAbutPier | #195099 | Drawing dimension error | 47 | 2005-10-06 |
| Answered | AAbutPier | #195103 | About file layout | 70 | 2005-10-05 |
| Answered | AAbutPier | #195098 | Drawing output error | 71 | 2005-10-05 |
| Answered | AAbutPier | #195096 | Applying the revised bridge drainage criteria | 45 | 2005-10-05 |