About file layout
파일 본수를 늘려도 자꾸 NG가 나는데 무슨 잘못때문인지 알려주세요.
Answer
안녕하세요. 한길아이티입니다. [개인정보]의 말뚝지지력에 대한 NG는 허용인발력에 대한 NG입니다. 지진시 CASE에서 (-)반력이 발생하였으며 주면마찰력을 고려하여도 현재 배치된 말뚝의 길이가 5.400m로 짧아서 허용인발력은 적게 산정이 됩니다. 말뚝배치에 대한 부분을 다시 검토하셔야 할 것 같습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #195158 | Moving box | 45 | 2005-10-07 |
| Answered | AAbutPier | #195157 | EL values are correct but the section shape is wrong | 83 | 2005-10-07 |
| Answered | AAbutPier | #195156 | Bearings missing from general drawing, please check | 101 | 2005-10-07 |
| Answered | AAbutPier | #195149 | Cannot set cross beams in seismic analysis | 70 | 2005-10-07 |
| Answered | AAbutPier | #195143 | Please check abutment front view, delivery is imminent | 53 | 2005-10-07 |
| Answered | AAbutPier | #195139 | Abutment plan view looks wrong | 26 | 2005-10-06 |
| Answered | AAbutPier | #195134 | Error when calculating general quantities | 23 | 2005-10-06 |
| Answered | AAbutPier | #195123 | Earthwork calculation and shoe layout for separated up/down-line bridge | 63 | 2005-10-06 |
| Answered | AAbutPier | #195121 | Seismic analysis data error | 29 | 2005-10-06 |
| Answered | AAbutPier | #195117 | Drawing dimension error | 27 | 2005-10-06 |
| Answered | AAbutPier | #195113 | Drawing output error | 68 | 2005-10-06 |
| Answered | AAbutPier | #195150 | In a skewed bridge | 72 | 2005-10-06 |
| Answered | AAbutPier | #195126 | Rebar marking | 61 | 2005-10-06 |
| Answered | AAbutPier | #195118 | Entered bearing coordinates, please check | 52 | 2005-10-06 |
| Answered | AAbutPier | #195111 | SAP2000 error | 85 | 2005-10-06 |
| Answered | AAbutPier | #195108 | Quantity calculation | 63 | 2005-10-06 |
| Answered | AAbutPier | #195099 | Drawing dimension error | 47 | 2005-10-06 |
| Answered | AAbutPier | #195103 | About file layout · Currently viewing | 70 | 2005-10-05 |
| Answered | AAbutPier | #195098 | Drawing output error | 71 | 2005-10-05 |
| Answered | AAbutPier | #195096 | Applying the revised bridge drainage criteria | 45 | 2005-10-05 |