Crash with pier main rebar
교각설계환경에서 기초지반의최대허용지지력을 교각마다 사용자로 직접입력하고 다음, 다음으로 넘어가 SAP OUT파일을 불러들이고, 다음,다음으로 넘어가 교각기둥부주철근입력에서 다음을 누르면 다운이됩니다.
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #194922 | Pier reinforcement detailing? | 16 | 2005-09-29 |
| Answered | AAbutPier | #194921 | Modeling in seismic analysis | 35 | 2005-09-28 |
| Answered | AAbutPier | #194920 | Axial force | 7 | 2005-09-28 |
| Answered | AAbutPier | #194915 | Please check | 25 | 2005-09-28 |
| Answered | AAbutPier | #194907 | Bridge bearing location looks wrong | 20 | 2005-09-28 |
| Answered | AAbutPier | #194906 | [Personal info] Details of our phone call | 27 | 2005-09-28 |
| Answered | AAbutPier | #194904 | Error when generating drawings | 16 | 2005-09-28 |
| Answered | AAbutPier | #194903 | Bearing layout considering longitudinal profile | 32 | 2005-09-28 |
| Answered | AAbutPier | #194901 | Hoop ties in hollow column | 35 | 2005-09-28 |
| Answered | AAbutPier | #194898 | Concrete placement quantity is missing | 22 | 2005-09-28 |
| Answered | AAbutPier | #194896 | Question about girder layout | 46 | 2005-09-28 |
| Answered | AAbutPier | #194932 | Can the slab section be shown as above? | 52 | 2005-09-28 |
| Answered | AAbutPier | #194931 | Help file correction | 43 | 2005-09-28 |
| Answered | AAbutPier | #194928 | Please check the number of bearing rebars | 76 | 2005-09-28 |
| Answered | AAbutPier | #194917 | Crash with pier main rebar · Currently viewing | 14 | 2005-09-28 |
| Answered | AAbutPier | #194892 | Seismic analysis | 29 | 2005-09-28 |
| Answered | AAbutPier | #194891 | Wing wall reinforcement issue... | 46 | 2005-09-28 |
| Answered | AAbutPier | #194887 | When checking pier columns... | 28 | 2005-09-28 |
| Answered | AAbutPier | #194888 | Seismic analysis | 38 | 2005-09-27 |
| Answered | AAbutPier | #194885 | Error outputting cast-in-place pile detail drawing | 49 | 2005-09-27 |