Please check
이번에 패치실행시키고 난후에 슬래브제원입력에서 L1,L2,L3가 제대로 입력이 안됩니다. 입력값하고 화면하고 일치하지않고 그값이 나중에 교대일반도하고 el산출근거도에도 영향이 있습니다. 확인해주세요..
Answer
안녕하세요. 한길아이티입니다. 수정하였습니다. 18시 패치를 설치하고 사용하시면 이상이 없습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #194922 | Pier reinforcement detailing? | 16 | 2005-09-29 |
| Answered | AAbutPier | #194921 | Modeling in seismic analysis | 35 | 2005-09-28 |
| Answered | AAbutPier | #194920 | Axial force | 7 | 2005-09-28 |
| Answered | AAbutPier | #194915 | Please check · Currently viewing | 25 | 2005-09-28 |
| Answered | AAbutPier | #194907 | Bridge bearing location looks wrong | 20 | 2005-09-28 |
| Answered | AAbutPier | #194906 | [Personal info] Details of our phone call | 27 | 2005-09-28 |
| Answered | AAbutPier | #194904 | Error when generating drawings | 16 | 2005-09-28 |
| Answered | AAbutPier | #194903 | Bearing layout considering longitudinal profile | 32 | 2005-09-28 |
| Answered | AAbutPier | #194901 | Hoop ties in hollow column | 35 | 2005-09-28 |
| Answered | AAbutPier | #194898 | Concrete placement quantity is missing | 22 | 2005-09-28 |
| Answered | AAbutPier | #194896 | Question about girder layout | 46 | 2005-09-28 |
| Answered | AAbutPier | #194932 | Can the slab section be shown as above? | 52 | 2005-09-28 |
| Answered | AAbutPier | #194931 | Help file correction | 43 | 2005-09-28 |
| Answered | AAbutPier | #194928 | Please check the number of bearing rebars | 76 | 2005-09-28 |
| Answered | AAbutPier | #194917 | Crash with pier main rebar | 14 | 2005-09-28 |
| Answered | AAbutPier | #194892 | Seismic analysis | 29 | 2005-09-28 |
| Answered | AAbutPier | #194891 | Wing wall reinforcement issue... | 46 | 2005-09-28 |
| Answered | AAbutPier | #194887 | When checking pier columns... | 28 | 2005-09-28 |
| Answered | AAbutPier | #194888 | Seismic analysis | 38 | 2005-09-27 |
| Answered | AAbutPier | #194885 | Error outputting cast-in-place pile detail drawing | 49 | 2005-09-27 |