Wing wall reinforcement issue...
날개벽의 넘버링이 이상하게 나옵니다. 교대2 우측 날개벽에서 A구간과 D구간의 철근을 달리 하였을 경우 WR7 번의 경우 13개이나 21개로 표시되고 빈공간을 가리키고 있습니다. 수정 요망합니다....
Answer
안녕하세요. 한길아이티입니다. 답변이 늦어 죄송합니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #194922 | Pier reinforcement detailing? | 16 | 2005-09-29 |
| Answered | AAbutPier | #194921 | Modeling in seismic analysis | 35 | 2005-09-28 |
| Answered | AAbutPier | #194920 | Axial force | 7 | 2005-09-28 |
| Answered | AAbutPier | #194915 | Please check | 25 | 2005-09-28 |
| Answered | AAbutPier | #194907 | Bridge bearing location looks wrong | 20 | 2005-09-28 |
| Answered | AAbutPier | #194906 | [Personal info] Details of our phone call | 27 | 2005-09-28 |
| Answered | AAbutPier | #194904 | Error when generating drawings | 16 | 2005-09-28 |
| Answered | AAbutPier | #194903 | Bearing layout considering longitudinal profile | 32 | 2005-09-28 |
| Answered | AAbutPier | #194901 | Hoop ties in hollow column | 35 | 2005-09-28 |
| Answered | AAbutPier | #194898 | Concrete placement quantity is missing | 22 | 2005-09-28 |
| Answered | AAbutPier | #194896 | Question about girder layout | 46 | 2005-09-28 |
| Answered | AAbutPier | #194932 | Can the slab section be shown as above? | 52 | 2005-09-28 |
| Answered | AAbutPier | #194931 | Help file correction | 43 | 2005-09-28 |
| Answered | AAbutPier | #194928 | Please check the number of bearing rebars | 76 | 2005-09-28 |
| Answered | AAbutPier | #194917 | Crash with pier main rebar | 14 | 2005-09-28 |
| Answered | AAbutPier | #194892 | Seismic analysis | 29 | 2005-09-28 |
| Answered | AAbutPier | #194891 | Wing wall reinforcement issue... · Currently viewing | 46 | 2005-09-28 |
| Answered | AAbutPier | #194887 | When checking pier columns... | 28 | 2005-09-28 |
| Answered | AAbutPier | #194888 | Seismic analysis | 38 | 2005-09-27 |
| Answered | AAbutPier | #194885 | Error outputting cast-in-place pile detail drawing | 49 | 2005-09-27 |