Skip to content
AnsweredAAbutPierQ&A #1944462005-09-05 21:10 · Views 9

Follow-up question to 17160

교각 4번뿐만아니라 교각 4번부터 뒤로 계속 에러가 나네여. 답변부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 최신버전으로 패치후에 이상이 있으시면 게시판에 남겨주시기 바랍니다. (9월 5일자 버전으로 확인하시면 됩니다.) 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#194444Seismic modeling error162005-09-06
AnsweredAAbutPier#194441Setting the step in the pier cap132005-09-06
AnsweredAAbutPier#194432Uploading the attached file242005-09-06
AnsweredAAbutPier#194428Checking pile displacement and member forces512005-09-06
AnsweredAAbutPier#194423Error in pier coping section force summary382005-09-05
AnsweredAAbutPier#194422Why doesn't SAP launch automatically?152005-09-05
AnsweredAAbutPier#194446Follow-up question to 17160 · Currently viewing92005-09-05
AnsweredAAbutPier#194416Problem with section dimensions in pier input..282005-09-05
AnsweredAAbutPier#194429Internal application error during pier design check122005-09-05
AnsweredAAbutPier#194424Warning message in seismic analysis282005-09-05
AnsweredAAbutPier#194419Further question on allowable pile pullout capacity...182005-09-05
AnsweredAAbutPier#194411About allowable pile pullout capacity422005-09-05
AnsweredAAbutPier#194406File behaves strangely after rearranging shoes on a skewed bridge292005-09-04
AnsweredAAbutPier#194402HCAD review1252005-09-03
AnsweredAAbutPier#194398Additional seismic section generation error292005-09-03
AnsweredAAbutPier#194395Ground information cannot be entered...102005-09-03
AnsweredAAbutPier#194391Section error in seismic analysis492005-09-03
AnsweredAAbutPier#194388SAP will not run242005-09-03
AnsweredAAbutPier#194397Why is there N.G in the calculation report but O.K in the analysis result summary?302005-09-02
AnsweredAAbutPier#194393Question on seismic analysis of a single-span bridge522005-09-02
Sign in to ask