Uploading the attached file
.
Answer
안녕하세요. 한길아이티입니다. 전화상으로 말씀드렸습니다. 출력된 계산서를 첨부하오니 참고하시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #194444 | Seismic modeling error | 16 | 2005-09-06 |
| Answered | AAbutPier | #194441 | Setting the step in the pier cap | 13 | 2005-09-06 |
| Answered | AAbutPier | #194432 | Uploading the attached file · Currently viewing | 24 | 2005-09-06 |
| Answered | AAbutPier | #194428 | Checking pile displacement and member forces | 51 | 2005-09-06 |
| Answered | AAbutPier | #194423 | Error in pier coping section force summary | 38 | 2005-09-05 |
| Answered | AAbutPier | #194422 | Why doesn't SAP launch automatically? | 15 | 2005-09-05 |
| Answered | AAbutPier | #194446 | Follow-up question to 17160 | 9 | 2005-09-05 |
| Answered | AAbutPier | #194416 | Problem with section dimensions in pier input.. | 28 | 2005-09-05 |
| Answered | AAbutPier | #194429 | Internal application error during pier design check | 12 | 2005-09-05 |
| Answered | AAbutPier | #194424 | Warning message in seismic analysis | 28 | 2005-09-05 |
| Answered | AAbutPier | #194419 | Further question on allowable pile pullout capacity... | 18 | 2005-09-05 |
| Answered | AAbutPier | #194411 | About allowable pile pullout capacity | 42 | 2005-09-05 |
| Answered | AAbutPier | #194406 | File behaves strangely after rearranging shoes on a skewed bridge | 29 | 2005-09-04 |
| Answered | AAbutPier | #194402 | HCAD review | 125 | 2005-09-03 |
| Answered | AAbutPier | #194398 | Additional seismic section generation error | 29 | 2005-09-03 |
| Answered | AAbutPier | #194395 | Ground information cannot be entered... | 10 | 2005-09-03 |
| Answered | AAbutPier | #194391 | Section error in seismic analysis | 49 | 2005-09-03 |
| Answered | AAbutPier | #194388 | SAP will not run | 24 | 2005-09-03 |
| Answered | AAbutPier | #194397 | Why is there N.G in the calculation report but O.K in the analysis result summary? | 30 | 2005-09-02 |
| Answered | AAbutPier | #194393 | Question on seismic analysis of a single-span bridge | 52 | 2005-09-02 |