Skip to content
AnsweredAAbutPierQ&A #1944242005-09-05 14:28 · Views 28

Warning message in seismic analysis

부탁 드립니다

Answer

안녕하세요. 한길아이티입니다. 29번절점과 30번절점과의 간격이 너무 붙어서 생긴 경고 메세지입니다. 무시하고 사용하셔도 무방합니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#194444Seismic modeling error162005-09-06
AnsweredAAbutPier#194441Setting the step in the pier cap132005-09-06
AnsweredAAbutPier#194432Uploading the attached file242005-09-06
AnsweredAAbutPier#194428Checking pile displacement and member forces512005-09-06
AnsweredAAbutPier#194423Error in pier coping section force summary382005-09-05
AnsweredAAbutPier#194422Why doesn't SAP launch automatically?152005-09-05
AnsweredAAbutPier#194446Follow-up question to 1716092005-09-05
AnsweredAAbutPier#194416Problem with section dimensions in pier input..282005-09-05
AnsweredAAbutPier#194429Internal application error during pier design check122005-09-05
AnsweredAAbutPier#194424Warning message in seismic analysis · Currently viewing282005-09-05
AnsweredAAbutPier#194419Further question on allowable pile pullout capacity...182005-09-05
AnsweredAAbutPier#194411About allowable pile pullout capacity422005-09-05
AnsweredAAbutPier#194406File behaves strangely after rearranging shoes on a skewed bridge292005-09-04
AnsweredAAbutPier#194402HCAD review1252005-09-03
AnsweredAAbutPier#194398Additional seismic section generation error292005-09-03
AnsweredAAbutPier#194395Ground information cannot be entered...102005-09-03
AnsweredAAbutPier#194391Section error in seismic analysis492005-09-03
AnsweredAAbutPier#194388SAP will not run242005-09-03
AnsweredAAbutPier#194397Why is there N.G in the calculation report but O.K in the analysis result summary?302005-09-02
AnsweredAAbutPier#194393Question on seismic analysis of a single-span bridge522005-09-02
Sign in to ask