Additional seismic section generation error
화일 올립니다.
Answer
안녕하세요. 한길아이티입니다. 합쳐진 파일의 경우 교량기본구성입력에서 [개인정보]방향의 지점5에 슬래브분리가 선택되어있지 않습니다. 선택을 하신 후에 유간을 확인하시고 해석을 진행하시면 됩니다. 수정한 파일을 첨부하니 참조하시기 바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #194444 | Seismic modeling error | 16 | 2005-09-06 |
| Answered | AAbutPier | #194441 | Setting the step in the pier cap | 13 | 2005-09-06 |
| Answered | AAbutPier | #194432 | Uploading the attached file | 24 | 2005-09-06 |
| Answered | AAbutPier | #194428 | Checking pile displacement and member forces | 51 | 2005-09-06 |
| Answered | AAbutPier | #194423 | Error in pier coping section force summary | 38 | 2005-09-05 |
| Answered | AAbutPier | #194422 | Why doesn't SAP launch automatically? | 15 | 2005-09-05 |
| Answered | AAbutPier | #194446 | Follow-up question to 17160 | 9 | 2005-09-05 |
| Answered | AAbutPier | #194416 | Problem with section dimensions in pier input.. | 28 | 2005-09-05 |
| Answered | AAbutPier | #194429 | Internal application error during pier design check | 12 | 2005-09-05 |
| Answered | AAbutPier | #194424 | Warning message in seismic analysis | 28 | 2005-09-05 |
| Answered | AAbutPier | #194419 | Further question on allowable pile pullout capacity... | 18 | 2005-09-05 |
| Answered | AAbutPier | #194411 | About allowable pile pullout capacity | 42 | 2005-09-05 |
| Answered | AAbutPier | #194406 | File behaves strangely after rearranging shoes on a skewed bridge | 29 | 2005-09-04 |
| Answered | AAbutPier | #194402 | HCAD review | 125 | 2005-09-03 |
| Answered | AAbutPier | #194398 | Additional seismic section generation error · Currently viewing | 29 | 2005-09-03 |
| Answered | AAbutPier | #194395 | Ground information cannot be entered... | 10 | 2005-09-03 |
| Answered | AAbutPier | #194391 | Section error in seismic analysis | 49 | 2005-09-03 |
| Answered | AAbutPier | #194388 | SAP will not run | 24 | 2005-09-03 |
| Answered | AAbutPier | #194397 | Why is there N.G in the calculation report but O.K in the analysis result summary? | 30 | 2005-09-02 |
| Answered | AAbutPier | #194393 | Question on seismic analysis of a single-span bridge | 52 | 2005-09-02 |