Skip to content
AnsweredAAbutPierQ&A #1940962005-08-19 14:01 · Views 47

Calculating C and S values for pile head reinforcement

수고하십니다. 업무에 참고하시기 바람니다. 빠른 업데이트 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 탄성계수비(n)의 적용부분과 각도 최대값 산정부분에 오류가 있었습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#194135Generating input for seismic analysis302005-08-23
AnsweredAAbutPier#194130Abnormal reinforcement detailing in abutment wing wall302005-08-23
AnsweredAAbutPier#194133Difference between concrete quantity and placement quantity in quantity summary632005-08-22
AnsweredAAbutPier#194129Analysis result summary in the calculation report482005-08-22
AnsweredAAbutPier#194117Follow-up question on 16819342005-08-22
AnsweredAAbutPier#194116About girder layout for IPC bridges472005-08-21
AnsweredAAbutPier#194111Equation notation error342005-08-20
AnsweredAAbutPier#194110Rebar ratio of virtual concrete section382005-08-20
AnsweredAAbutPier#194106Questions about girder layout322005-08-20
AnsweredAAbutPier#194095Error when swapping up and down lines402005-08-19
AnsweredAAbutPier#194096Calculating C and S values for pile head reinforcement · Currently viewing472005-08-19
AnsweredAAbutPier#194090Range of reinforcement under bridge bearings422005-08-19
AnsweredAAbutPier#194084Error in wing wall reinforcement drawing?232005-08-19
AnsweredAAbutPier#194077RC slab bridge with different numbers of bearings472005-08-19
AnsweredAAbutPier#194075Seismic load272005-08-19
AnsweredAAbutPier#194066About ties in plastic design172005-08-18
AnsweredAAbutPier#194063Automatic PC beam layout112005-08-18
AnsweredAAbutPier#194056About wave pressure242005-08-18
AnsweredAAbutPier#194083aline....data242005-08-18
AnsweredAAbutPier#194064Additional question on post 16635262005-08-18
Sign in to ask