교대 흉벽수평철근 배근 확인바랍니다.
Answer
안녕하세요. 한길아이티입니다. 말씀하신 부분은 확인하였습니다. 수정하여 금일자 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #193883 | Bearing capacity check including MAA applied forces | 39 | 2005-08-10 |
| Answered | AAbutPier | #193871 | Please check · Currently viewing | 36 | 2005-08-10 |
| Answered | AAbutPier | #193869 | Hollow column | 41 | 2005-08-10 |
| Answered | AAbutPier | #193863 | Something odd in the design check | 26 | 2005-08-10 |
| Answered | AAbutPier | #193884 | Wave pressure and buoyancy | 42 | 2005-08-10 |
| Answered | AAbutPier | #193879 | Foundation bearing capacity check | 46 | 2005-08-10 |
| Answered | AAbutPier | #193877 | Moment magnification | 54 | 2005-08-10 |
| Answered | AAbutPier | #193873 | How do I enter the alignment when designing a pier? | 47 | 2005-08-10 |
| Answered | AAbutPier | #193856 | Please check coping reinforcement detailing | 69 | 2005-08-10 |
| Answered | AAbutPier | #193847 | About seismic analysis | 36 | 2005-08-09 |
| Answered | AAbutPier | #193861 | Review comments | 58 | 2005-08-09 |
| Answered | AAbutPier | #193832 | Cannot enter second-layer main rebar in abutment footing heel | 41 | 2005-08-09 |
| Answered | AAbutPier | #193829 | Drawing output looks wrong | 21 | 2005-08-09 |
| Answered | AAbutPier | #193828 | Request to add earthwork when installing abutment retaining walls | 52 | 2005-08-09 |
| Answered | AAbutPier | #193820 | Lap splice length of wall main rebar | 24 | 2005-08-08 |
| Answered | AAbutPier | #193817 | Question about abutment protection block quantity | 46 | 2005-08-08 |
| Answered | AAbutPier | #193811 | Internal program error | 28 | 2005-08-08 |
| Answered | AAbutPier | #193806 | Internal application error | 24 | 2005-08-08 |
| Answered | AAbutPier | #193804 | Error when outputting abutment calculation report | 16 | 2005-08-08 |
| Answered | AAbutPier | #193809 | About wind load | 31 | 2005-08-08 |