Results?
기둥전단설계에서 AvUse = 1.#IO cm² ≥ 5.600 cm² ∴ O.K 위와 같은 결과가 나오는데 확인부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 기둥부 띠철근 배치입력에서 내측 띠철근에 대한 입력사항이 누락 되었습니다. 띠철근 배치 내측에서 구간을 설정하시고 내측 띠철근에 대한 사항을 입력하시면 문제없이 출력됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #193800 | When entering superstructure wind load... | 21 | 2005-08-07 |
| Answered | AAbutPier | #193796 | Why isn't pier reinforcement drawing 1 generated? | 24 | 2005-08-07 |
| Answered | AAbutPier | #193793 | Hollow wall pier cap beam | 24 | 2005-08-06 |
| Answered | AAbutPier | #193792 | Results? · Currently viewing | 17 | 2005-08-06 |
| Answered | AAbutPier | #193791 | Bridge centerline and shoe centerline do not match | 26 | 2005-08-06 |
| Answered | AAbutPier | #193788 | No quantity output for approach slab A2 | 27 | 2005-08-06 |
| Answered | AAbutPier | #193787 | SAP input error | 28 | 2005-08-06 |
| Answered | AAbutPier | #193782 | SAP input error | 12 | 2005-08-06 |
| Answered | AAbutPier | #193776 | Drawing generation failure and internal error | 36 | 2005-08-06 |
| Answered | AAbutPier | #193786 | Direction indicator | 30 | 2005-08-05 |
| Answered | AAbutPier | #193765 | Wall horizontal rebar spacing looks wrong... | 42 | 2005-08-05 |
| Answered | AAbutPier | #193784 | When outputting pier reinforcement drawing... | 16 | 2005-08-05 |
| Answered | AAbutPier | #193778 | Inquiry about APier import error | 28 | 2005-08-05 |
| Answered | AAbutPier | #193764 | Output error | 51 | 2005-08-05 |
| Answered | AAbutPier | #193760 | Internal program error | 29 | 2005-08-05 |
| Answered | AAbutPier | #193752 | How do I rotate the pier foundation? | 55 | 2005-08-04 |
| Answered | AAbutPier | #193744 | Seismic section input | 23 | 2005-08-04 |
| Answered | AAbutPier | #193745 | Please check | 30 | 2005-08-04 |
| Answered | AAbutPier | #193742 | About column grooving | 32 | 2005-08-04 |
| Answered | AAbutPier | #193741 | Coping step issue | 45 | 2005-08-03 |