No quantity output for approach slab A2
접속슬라브 A2의 수량이 안나옵니다[전화]
Answer
안녕하세요. 한길아이티입니다. [교대입력] - [수량선택사항] - "수량집계에 접속슬래브,완충슬래브 포함" 옵션을 적용으로 설정하시면 접속슬래브 수량이 산출됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #193800 | When entering superstructure wind load... | 21 | 2005-08-07 |
| Answered | AAbutPier | #193796 | Why isn't pier reinforcement drawing 1 generated? | 24 | 2005-08-07 |
| Answered | AAbutPier | #193793 | Hollow wall pier cap beam | 24 | 2005-08-06 |
| Answered | AAbutPier | #193792 | Results? | 17 | 2005-08-06 |
| Answered | AAbutPier | #193791 | Bridge centerline and shoe centerline do not match | 26 | 2005-08-06 |
| Answered | AAbutPier | #193788 | No quantity output for approach slab A2 · Currently viewing | 27 | 2005-08-06 |
| Answered | AAbutPier | #193787 | SAP input error | 28 | 2005-08-06 |
| Answered | AAbutPier | #193782 | SAP input error | 12 | 2005-08-06 |
| Answered | AAbutPier | #193776 | Drawing generation failure and internal error | 36 | 2005-08-06 |
| Answered | AAbutPier | #193786 | Direction indicator | 30 | 2005-08-05 |
| Answered | AAbutPier | #193765 | Wall horizontal rebar spacing looks wrong... | 42 | 2005-08-05 |
| Answered | AAbutPier | #193784 | When outputting pier reinforcement drawing... | 16 | 2005-08-05 |
| Answered | AAbutPier | #193778 | Inquiry about APier import error | 28 | 2005-08-05 |
| Answered | AAbutPier | #193764 | Output error | 51 | 2005-08-05 |
| Answered | AAbutPier | #193760 | Internal program error | 29 | 2005-08-05 |
| Answered | AAbutPier | #193752 | How do I rotate the pier foundation? | 55 | 2005-08-04 |
| Answered | AAbutPier | #193744 | Seismic section input | 23 | 2005-08-04 |
| Answered | AAbutPier | #193745 | Please check | 30 | 2005-08-04 |
| Answered | AAbutPier | #193742 | About column grooving | 32 | 2005-08-04 |
| Answered | AAbutPier | #193741 | Coping step issue | 45 | 2005-08-03 |