Skip to content
AnsweredAAbutPierQ&A #1933302005-07-15 18:04 · Views 60

Please check vertical shear reinforcement

더운데 수고많으십니다. P2 사가정방향 수직전단철근이 코핑상단 주철근 까지 올라가질 못합니다, 검토 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 두부보제원에서 Dh1 값을 0으로 주시고 1열 좌측의 두부보쪽을 도면에서 수작업 하시면 됩니다. 자세한 내용을 전화상으로 말씀드리겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#193383Wing wall - phone call details322005-07-19
AnsweredAAbutPier#193379Regarding abutment and pier 01172005-07-18
AnsweredAAbutPier#193373Seismic model geometry looks wrong82005-07-18
AnsweredAAbutPier#193367Error in pier foundation during modeling analysis332005-07-18
AnsweredAAbutPier#193382Inquiry about bundled rebar232005-07-18
AnsweredAAbutPier#193380Abutment and pier 02162005-07-18
AnsweredAAbutPier#193366When outputting drawings662005-07-18
AnsweredAAbutPier#193363File freezes while opening, please take a look312005-07-16
AnsweredAAbutPier#193357Rebar specifications for multi-column pier442005-07-16
AnsweredAAbutPier#193356Service condition analysis error442005-07-16
AnsweredAAbutPier#193330Please check vertical shear reinforcement · Currently viewing602005-07-15
AnsweredAAbutPier#193329Abutment parapet rebar placement error742005-07-15
AnsweredAAbutPier#193338For a bridge with a corner cut362005-07-15
AnsweredAAbutPier#193308Please check seismic analysis102005-07-14
AnsweredAAbutPier#193304Error during seismic analysis412005-07-14
AnsweredAAbutPier#193318Question about load combinations452005-07-14
AnsweredAAbutPier#193312Data for pier section addition request452005-07-14
AnsweredAAbutPier#193303Request to add pier section142005-07-14
AnsweredAAbutPier#193294Bridge bearing check52005-07-14
AnsweredAAbutPier#193285File attached: wing wall calculation does not work322005-07-14
Sign in to ask