Intermediate tie rebar notation in pi-shaped pier reinforcement drawing
안녕하십니깐... 파이형 교각 에서 (첨부화일의 P2)의 소성설계를 적용하여 띠철근을 4개 구역으로 적용하였으나..배근도 출력시.. 중간부의 일반구간이 출력되지 않네요... 확인 후 전화부탁 드립니다... [개인정보] [개인정보]
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #192835 | Question about pier bearing seat reinforcement detailing | 38 | 2005-06-23 |
| Answered | AAbutPier | #192844 | Drawing output problems | 56 | 2005-06-23 |
| Answered | AAbutPier | #192832 | Superstructure bri, brx | 18 | 2005-06-23 |
| Answered | AAbutPier | #192831 | Downbound bridge not loaded correctly when added | 27 | 2005-06-23 |
| Answered | AAbutPier | #192823 | Warning message during seismic analysis | 19 | 2005-06-23 |
| Answered | AAbutPier | #192816 | Bearing specifications | 36 | 2005-06-23 |
| Answered | AAbutPier | #192815 | Intermediate tie rebar notation in pi-shaped pier reinforcement drawing · Currently viewing | 36 | 2005-06-23 |
| Answered | AAbutPier | #192814 | Girder layout screen does not appear | 24 | 2005-06-23 |
| Answered | AAbutPier | #192812 | Finite-length piles | 22 | 2005-06-23 |
| Answered | AAbutPier | #192806 | Bridge with separated up and down lines | 28 | 2005-06-22 |
| Answered | AAbutPier | #192801 | Error when exporting to Excel, please check | 26 | 2005-06-22 |
| Answered | AAbutPier | #192800 | Additional file | 25 | 2005-06-22 |
| Answered | AAbutPier | #192799 | About seismic calculation | 23 | 2005-06-22 |
| Answered | AAbutPier | #192821 | Applying effective stiffness when considering slenderness effects | 81 | 2005-06-22 |
| Answered | AAbutPier | #192820 | Section input for seismic analysis | 13 | 2005-06-22 |
| Answered | AAbutPier | #192807 | Finite-length piles | 30 | 2005-06-22 |
| Answered | AAbutPier | #192780 | Applying foundation mass for pi-shaped pier | 47 | 2005-06-21 |
| Answered | AAbutPier | #192779 | Problem in abutment temperature rebar calculation (follow-up to yesterday's call) | 47 | 2005-06-21 |
| Answered | AAbutPier | #192773 | Please review | 49 | 2005-06-20 |
| Answered | AAbutPier | #192767 | Wing wall reinforcement drawing 3 | 48 | 2005-06-20 |