Skip to content
AnsweredAAbutPierQ&A #1923182005-06-02 16:35 · Views 27

Question about splicing horizontal rebar in piers

교각 기둥부에 띠철근의 연결을 커플러로 하고 싶은데 제가 찾아보니 수직철근에만 적용할수 있더라구요 혹 띠철근에 커플러로하는 옵션이 있는지요 늘 감사드립니다^^

Answer

안녕하세요. 한길아이티입니다. 띠철근에 대한 설정은 [교각입력]-[기둥부 띠철근 배치]에서 설정하시면 됩니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#192328Questions about apier392005-06-03
AnsweredAAbutPier#192322Drawing differs from input values (file uploaded)112005-06-03
AnsweredAAbutPier#192321Issue with seismic horizontal force372005-06-03
AnsweredAAbutPier#192308Question about rebar waste allowance252005-06-02
AnsweredAAbutPier#192318Question about splicing horizontal rebar in piers · Currently viewing272005-06-02
AnsweredAAbutPier#192288Reaction values look wrong in pier seismic check..432005-06-02
AnsweredAAbutPier#192275Error in abutment wall vertical rebar detail282005-06-01
AnsweredAAbutPier#192274Abutment error, continued from yesterday162005-06-01
AnsweredAAbutPier#192296Abutment calculation report432005-06-01
AnsweredAAbutPier#192293Position of bridge bearings shown on screen442005-06-01
AnsweredAAbutPier#192280Drawing output error272005-06-01
AnsweredAAbutPier#192277Abutment error452005-06-01
AnsweredAAbutPier#192268Error generating structural calculation report and drawings172005-06-01
AnsweredAAbutPier#192253It is in the opposite direction182005-06-01
AnsweredAAbutPier#192252Allowable bearing capacity of abutment piles172005-06-01
AnsweredAAbutPier#192246Abutment error62005-05-31
AnsweredAAbutPier#192240Please check formwork quantity212005-05-31
AnsweredAAbutPier#192261Question about rebar numbers in drawings222005-05-31
AnsweredAAbutPier#192256Question442005-05-31
AnsweredAAbutPier#192247Applying response modification factor to piles202005-05-31
Sign in to ask