Question about splicing horizontal rebar in piers
교각 기둥부에 띠철근의 연결을 커플러로 하고 싶은데 제가 찾아보니 수직철근에만 적용할수 있더라구요 혹 띠철근에 커플러로하는 옵션이 있는지요 늘 감사드립니다^^
Answer
안녕하세요. 한길아이티입니다. 띠철근에 대한 설정은 [교각입력]-[기둥부 띠철근 배치]에서 설정하시면 됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #192328 | Questions about apier | 39 | 2005-06-03 |
| Answered | AAbutPier | #192322 | Drawing differs from input values (file uploaded) | 11 | 2005-06-03 |
| Answered | AAbutPier | #192321 | Issue with seismic horizontal force | 37 | 2005-06-03 |
| Answered | AAbutPier | #192308 | Question about rebar waste allowance | 25 | 2005-06-02 |
| Answered | AAbutPier | #192318 | Question about splicing horizontal rebar in piers · Currently viewing | 27 | 2005-06-02 |
| Answered | AAbutPier | #192288 | Reaction values look wrong in pier seismic check.. | 43 | 2005-06-02 |
| Answered | AAbutPier | #192275 | Error in abutment wall vertical rebar detail | 28 | 2005-06-01 |
| Answered | AAbutPier | #192274 | Abutment error, continued from yesterday | 16 | 2005-06-01 |
| Answered | AAbutPier | #192296 | Abutment calculation report | 43 | 2005-06-01 |
| Answered | AAbutPier | #192293 | Position of bridge bearings shown on screen | 44 | 2005-06-01 |
| Answered | AAbutPier | #192280 | Drawing output error | 27 | 2005-06-01 |
| Answered | AAbutPier | #192277 | Abutment error | 45 | 2005-06-01 |
| Answered | AAbutPier | #192268 | Error generating structural calculation report and drawings | 17 | 2005-06-01 |
| Answered | AAbutPier | #192253 | It is in the opposite direction | 18 | 2005-06-01 |
| Answered | AAbutPier | #192252 | Allowable bearing capacity of abutment piles | 17 | 2005-06-01 |
| Answered | AAbutPier | #192246 | Abutment error | 6 | 2005-05-31 |
| Answered | AAbutPier | #192240 | Please check formwork quantity | 21 | 2005-05-31 |
| Answered | AAbutPier | #192261 | Question about rebar numbers in drawings | 22 | 2005-05-31 |
| Answered | AAbutPier | #192256 | Question | 44 | 2005-05-31 |
| Answered | AAbutPier | #192247 | Applying response modification factor to piles | 20 | 2005-05-31 |