AnsweredAAbutPierQ&A #1922932005-06-01 16:42 · Views 44

Position of bridge bearings shown on screen

지점각도 입력 화면에서 보여지는 교각의 각도나 교량받침의 위치를 맞출수가 없습니다. P1의 각도를 90도로 줬을경우에 일치하고 제가 원하는 96.591이란각도를 넣었을경우에 첨부한 파일과 같은 화면을 보여줍니다.

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#192328Questions about apier392005-06-03
AnsweredAAbutPier#192322Drawing differs from input values (file uploaded)112005-06-03
AnsweredAAbutPier#192321Issue with seismic horizontal force372005-06-03
AnsweredAAbutPier#192308Question about rebar waste allowance252005-06-02
AnsweredAAbutPier#192318Question about splicing horizontal rebar in piers272005-06-02
AnsweredAAbutPier#192288Reaction values look wrong in pier seismic check..432005-06-02
AnsweredAAbutPier#192275Error in abutment wall vertical rebar detail282005-06-01
AnsweredAAbutPier#192274Abutment error, continued from yesterday162005-06-01
AnsweredAAbutPier#192296Abutment calculation report432005-06-01
AnsweredAAbutPier#192293Position of bridge bearings shown on screen · Currently viewing442005-06-01
AnsweredAAbutPier#192280Drawing output error272005-06-01
AnsweredAAbutPier#192277Abutment error452005-06-01
AnsweredAAbutPier#192268Error generating structural calculation report and drawings172005-06-01
AnsweredAAbutPier#192253It is in the opposite direction182005-06-01
AnsweredAAbutPier#192252Allowable bearing capacity of abutment piles172005-06-01
AnsweredAAbutPier#192246Abutment error62005-05-31
AnsweredAAbutPier#192240Please check formwork quantity212005-05-31
AnsweredAAbutPier#192261Question about rebar numbers in drawings222005-05-31
AnsweredAAbutPier#192256Question442005-05-31
AnsweredAAbutPier#192247Applying response modification factor to piles202005-05-31
Sign in to ask