Skip to content
AnsweredAAbutPierQ&A #1922462005-05-31 21:47 · Views 6

Abutment error

시점부교대의 일반도상 중앙부의 단면도 와 배근도의 단면도가 서로 상이 합니다. (흉벽높이) 파일을 첨부하오니 조속히 검토 바랍니다. [휴대]

Answer

안녕하세요. 한길아이티입니다. 벽체부분에 단면이 잘못 표현이 되는 것은 수정하였습니다. 금일자 패치에 적용하도록 하겠습니다. 입력값중 주철근 및 배력철근관련된 값을 확인하여 주시기 바랍니다. 배력철근은 2단으로 배치하였으나 주철근은 1단으로 배치된 값들이 있습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#192328Questions about apier392005-06-03
AnsweredAAbutPier#192322Drawing differs from input values (file uploaded)112005-06-03
AnsweredAAbutPier#192321Issue with seismic horizontal force372005-06-03
AnsweredAAbutPier#192308Question about rebar waste allowance252005-06-02
AnsweredAAbutPier#192318Question about splicing horizontal rebar in piers272005-06-02
AnsweredAAbutPier#192288Reaction values look wrong in pier seismic check..432005-06-02
AnsweredAAbutPier#192275Error in abutment wall vertical rebar detail282005-06-01
AnsweredAAbutPier#192274Abutment error, continued from yesterday162005-06-01
AnsweredAAbutPier#192296Abutment calculation report432005-06-01
AnsweredAAbutPier#192293Position of bridge bearings shown on screen442005-06-01
AnsweredAAbutPier#192280Drawing output error272005-06-01
AnsweredAAbutPier#192277Abutment error452005-06-01
AnsweredAAbutPier#192268Error generating structural calculation report and drawings172005-06-01
AnsweredAAbutPier#192253It is in the opposite direction182005-06-01
AnsweredAAbutPier#192252Allowable bearing capacity of abutment piles172005-06-01
AnsweredAAbutPier#192246Abutment error · Currently viewing62005-05-31
AnsweredAAbutPier#192240Please check formwork quantity212005-05-31
AnsweredAAbutPier#192261Question about rebar numbers in drawings222005-05-31
AnsweredAAbutPier#192256Question442005-05-31
AnsweredAAbutPier#192247Applying response modification factor to piles202005-05-31
Sign in to ask