Question about the abutment general quantity summary table
교대법면콘크리트 보호공에 사용되는 뒷채움콘크리트, 기초블럭콘크리트의 량이 펌프카 타설에 포함되지 않는데, 왜 그런것인가요? 인력타설로 해서 그런가요? 아님 어데 설정해 주는 곳이 있나요?
Answer
안녕하세요. 한길아이티입니다. 보통의 평지에서의 뒷채움콘크리트나, 기초콘크리트등의 무근 콘크리트의 타설은 별도의 펌프카나 트레미등을 사용하지 않고 레미콘트럭에서 바로 콘크리트를 타설하기 때문에 수량에서도 펌프카 타설로 잡아주지 않습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #191739 | When printing drawings | 18 | 2005-05-06 |
| Answered | AAbutPier | #191731 | Please check | 30 | 2005-05-04 |
| Answered | AAbutPier | #191729 | Please check steel pipe pile quantities at the abutment | 25 | 2005-05-03 |
| Answered | AAbutPier | #191705 | Error when considering bearing seat level difference | 16 | 2005-04-29 |
| Answered | AAbutPier | #191709 | Non-shrink mortar quantity (2) | 35 | 2005-04-29 |
| Answered | AAbutPier | #191704 | Non-shrink mortar quantity for expansion joints | 37 | 2005-04-29 |
| Answered | AAbutPier | #191702 | Parapet wall height | 23 | 2005-04-29 |
| Answered | AAbutPier | #191699 | In the earthwork quantity report | 44 | 2005-04-28 |
| Answered | AAbutPier | #191688 | Seismic + foundation member force check | 49 | 2005-04-27 |
| Answered | AAbutPier | #191696 | In the earthwork quantity report (2) | 55 | 2005-04-27 |
| Answered | AAbutPier | #191682 | Wing wall check | 24 | 2005-04-27 |
| Answered | AAbutPier | #191686 | Inquiry | 44 | 2005-04-27 |
| Answered | AAbutPier | #191683 | Question about the abutment general quantity summary table · Currently viewing | 31 | 2005-04-27 |
| Answered | AAbutPier | #191680 | Seismic | 46 | 2005-04-27 |
| Answered | AAbutPier | #191671 | Slab bridge inquiry | 96 | 2005-04-27 |
| Answered | AAbutPier | #191670 | apier file (drawing output problem) | 29 | 2005-04-27 |
| Answered | AAbutPier | #191666 | Cast-in-place pile reinforcement detailing looks wrong | 32 | 2005-04-26 |
| Answered | AAbutPier | #191672 | Uploading files for cast-in-place piles | 119 | 2005-04-26 |
| Answered | AAbutPier | #191669 | Attaching cast-in-place pile calculation report (output in 3 tiers) | 49 | 2005-04-26 |
| Answered | AAbutPier | #191667 | Quantities should also include additional sod | 27 | 2005-04-26 |