Skip to content
AnsweredAAbutPierQ&A #1916672005-04-26 13:58 · Views 27

Quantities should also include additional sod

수량에 "추가떼"도 잡아주셔야 겠습니다.

Answer

안녕하세요. 한길아이티입니다. 말씀하신 부분은 현 작업일정상 빠른 적용은 어려울 것같습니다. 검토후 추후에 보완하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#191739When printing drawings182005-05-06
AnsweredAAbutPier#191731Please check302005-05-04
AnsweredAAbutPier#191729Please check steel pipe pile quantities at the abutment252005-05-03
AnsweredAAbutPier#191705Error when considering bearing seat level difference162005-04-29
AnsweredAAbutPier#191709Non-shrink mortar quantity (2)352005-04-29
AnsweredAAbutPier#191704Non-shrink mortar quantity for expansion joints372005-04-29
AnsweredAAbutPier#191702Parapet wall height232005-04-29
AnsweredAAbutPier#191699In the earthwork quantity report442005-04-28
AnsweredAAbutPier#191688Seismic + foundation member force check492005-04-27
AnsweredAAbutPier#191696In the earthwork quantity report (2)552005-04-27
AnsweredAAbutPier#191682Wing wall check242005-04-27
AnsweredAAbutPier#191686Inquiry442005-04-27
AnsweredAAbutPier#191683Question about the abutment general quantity summary table312005-04-27
AnsweredAAbutPier#191680Seismic462005-04-27
AnsweredAAbutPier#191671Slab bridge inquiry962005-04-27
AnsweredAAbutPier#191670apier file (drawing output problem)292005-04-27
AnsweredAAbutPier#191666Cast-in-place pile reinforcement detailing looks wrong322005-04-26
AnsweredAAbutPier#191672Uploading files for cast-in-place piles1192005-04-26
AnsweredAAbutPier#191669Attaching cast-in-place pile calculation report (output in 3 tiers)492005-04-26
AnsweredAAbutPier#191667Quantities should also include additional sod · Currently viewing272005-04-26
Sign in to ask