사각때문에 기초를 키우고 나서 파일을 개별배치하려고 합니다. 파일개수를 바꿀시에 E1에서 파일개수가 D1에 적용되고 그상태에서 말뚝개별배치를 설정하면 말뚝이 의도하지 않은 위치로 가버립니다.
Answer
안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #191433 | About the foundation · Currently viewing | 48 | 2005-04-12 |
| Answered | AAbutPier | #191429 | Drawing output error | 64 | 2005-04-12 |
| Answered | AAbutPier | #191428 | In seismic analysis of a column-type pier, why are the column and column top rigidly connected? | 63 | 2005-04-12 |
| Answered | AAbutPier | #191426 | Please check the quantity calculation report | 95 | 2005-04-12 |
| Answered | AAbutPier | #191424 | Cannot add a file | 56 | 2005-04-12 |
| Answered | AAbutPier | #191416 | Please check | 54 | 2005-04-11 |
| Answered | AAbutPier | #191415 | Please check | 94 | 2005-04-11 |
| Answered | AAbutPier | #191412 | Request | 43 | 2005-04-10 |
| Answered | AAbutPier | #191409 | Please check the error | 38 | 2005-04-09 |
| Answered | AAbutPier | #191400 | Please check the drawing (2) | 39 | 2005-04-09 |
| Answered | AAbutPier | #191393 | Seismic model has changed | 26 | 2005-04-09 |
| Answered | AAbutPier | #191392 | Checking confinement rebar design | 24 | 2005-04-09 |
| Answered | AAbutPier | #191387 | Seismic modeling isn't working properly | 68 | 2005-04-09 |
| Answered | AAbutPier | #191385 | Mismatch in calculated length of vertical wall back face | 38 | 2005-04-09 |
| Answered | AAbutPier | #191403 | Please check the drawing (4) | 70 | 2005-04-08 |
| Answered | AAbutPier | #191402 | Please check the drawing (3) | 46 | 2005-04-08 |
| Answered | AAbutPier | #191376 | Calculation error at wall H/2 point | 57 | 2005-04-08 |
| Answered | AAbutPier | #191398 | Please check the drawing | 40 | 2005-04-08 |
| Answered | AAbutPier | #191377 | [Urgent] Problem with column and foundation section check | 39 | 2005-04-08 |
| Answered | AAbutPier | #191372 | Attached brx file | 42 | 2005-04-08 |