Braking load calculation seems wrong
수고하십니다. [개인정보]=160.0m(2경간연속)로 구성되어있는 교량을 계산했습니다. 지점은 M,FF,MM,FF,M으로 구성하였습니다. 즉,P1,2는 고정단이고 P2는 접속부로써 가동단입니다 그런데 P1,2 시,제동하중 산정이 이상합니다. 그리고 P1의 시,제동 하중은 결과는 맞으나 작용 수평하중등의 수식 표현에 오류가 있는듯 합니다 확인 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 오류사항을 확인하였습니다. 다음 패치에 적용하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #191311 | Add design environment feature for abutments and piers | 54 | 2005-04-06 |
| Answered | AAbutPier | #191310 | When entering bridge bearing loads | 34 | 2005-04-06 |
| Answered | AAbutPier | #191307 | When checking foundation bearing capacity | 50 | 2005-04-05 |
| Answered | AAbutPier | #191306 | Error in seismic analysis | 57 | 2005-04-05 |
| Answered | AAbutPier | #191305 | During seismic analysis modeling | 48 | 2005-04-05 |
| Answered | AAbutPier | #191302 | Braking load calculation seems wrong · Currently viewing | 40 | 2005-04-05 |
| Answered | AAbutPier | #191299 | Incorrect horizontal haunch rebar placement in abutment wing wall | 69 | 2005-04-04 |
| Answered | AAbutPier | #191300 | Please check | 34 | 2005-04-04 |
| Answered | AAbutPier | #191297 | Please review | 58 | 2005-04-02 |
| Answered | AAbutPier | #191296 | No load factor check for overload in class 2 and 3 bridge design | 96 | 2005-04-02 |
| Answered | AAbutPier | #191281 | When checking column tie bar arrangement design | 59 | 2005-04-02 |
| Answered | AAbutPier | #191278 | Program error after running SAP in pier calculation? | 52 | 2005-04-01 |
| Answered | AAbutPier | #191276 | Error in bearing seat dimension design check | 59 | 2005-04-01 |
| Answered | AAbutPier | #191270 | Please review internal error | 69 | 2005-04-01 |
| Answered | AAbutPier | #191288 | Punching shear | 185 | 2005-04-01 |
| Answered | AAbutPier | #191268 | Please review internal error | 52 | 2005-04-01 |
| Answered | AAbutPier | #191263 | Bridge bearing location error | 40 | 2005-04-01 |
| Answered | AAbutPier | #191257 | Cannot add rebar | 65 | 2005-03-31 |
| Answered | AAbutPier | #191254 | About sketches in general quantity calculation | 48 | 2005-03-31 |
| Answered | AAbutPier | #191259 | Please review seismic modeling error | 61 | 2005-03-31 |