AnsweredAAbutPierQ&A #1912392005-03-30 23:16 · Views 44

Cannot place two-layer rebar at top of pier foundation

하단에는 2단배근이 되는데... 상단에는 2단배근이 1단에 겹처져서 나타납니다. 검토 부탁드립니다. 파일 첨부합니다. 수고하세요.

Answer

안녕하세요. 한길아이티입니다. 2단철근이 겹치는 경우 2단철근에 대한 철근중심거리를 확인하여 주시기 바랍니다. 2단의 경우 1단이 100이면 200이 입력되는 것이 일반적입니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#191250Horizontal force check852005-03-31
AnsweredAAbutPier#191247Bridge bearing layout drawing displays incorrectly1132005-03-31
AnsweredAAbutPier#191239Cannot place two-layer rebar at top of pier foundation · Currently viewing442005-03-30
AnsweredAAbutPier#191237Please review again512005-03-30
AnsweredAAbutPier#191228Please review442005-03-30
AnsweredAAbutPier#191231Regarding earthwork quantities782005-03-30
AnsweredAAbutPier#191227Error during seismic analysis modeling592005-03-30
AnsweredAAbutPier#191218Error in the curved direction during seismic analysis modeling352005-03-30
AnsweredAAbutPier#191212Different planned elevations at bearing seats at abutment start and end452005-03-30
AnsweredAAbutPier#191207Cross-section input for a widened bridge712005-03-29
AnsweredAAbutPier#191196Internal program error message in pier analysis722005-03-29
AnsweredAAbutPier#191195Beam layout1002005-03-29
AnsweredAAbutPier#191219Feature request for pier modeling and analysis472005-03-29
AnsweredAAbutPier#191216Error during corbel check452005-03-29
AnsweredAAbutPier#191199Please check472005-03-29
AnsweredAAbutPier#191187Abutment protection block error in quantity calculation1372005-03-29
AnsweredAAbutPier#191181Follow-up on my phone inquiry782005-03-29
AnsweredAAbutPier#191180Error when generating drawings922005-03-29
AnsweredAAbutPier#191175Please check wing wall rebar622005-03-28
AnsweredAAbutPier#191179Regarding posts 13742 and 13739952005-03-28
Sign in to ask