Attachment for 13515
13515첨부화일입니다.
Answer
안녕하세요. 한길아이티입니다. 종단선형의 VIP점과 EVC,BVC가 겹치는 것은 입력구간을 종곡선길이와 같게 입력하여서 겹치고 있습니다. 그리고 편구배 및 기타입력사항은 보내주신 파일로 맞는지를 검토할 수는 없습니다. 가지고 계신 선형자료와 ALINE상에서 출력되는 선형계산서를 비교하여 검토하여 주시기바랍니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #191024 | Abutment reinforcement drawing is not generated | 24 | 2005-03-16 |
| Answered | AAbutPier | #191009 | Please make a correction | 56 | 2005-03-15 |
| Answered | AAbutPier | #191007 | In the abutment design settings input field | 60 | 2005-03-15 |
| Answered | AAbutPier | #191003 | Seismic analysis | 59 | 2005-03-15 |
| Answered | AAbutPier | #190991 | Error during seismic analysis | 14 | 2005-03-14 |
| Answered | AAbutPier | #191001 | In the abutment design settings | 40 | 2005-03-14 |
| Answered | AAbutPier | #190987 | Error while entering abutment section | 18 | 2005-03-14 |
| Answered | AAbutPier | #190988 | Linked file for 13549 (CAD) | 30 | 2005-03-13 |
| Answered | AAbutPier | #190979 | Details from phone call | 28 | 2005-03-11 |
| Answered | AAbutPier | #190973 | Several corrections and checks requested | 85 | 2005-03-11 |
| Answered | AAbutPier | #190972 | About the pile calculation report | 59 | 2005-03-11 |
| Answered | AAbutPier | #190971 | Please check | 33 | 2005-03-11 |
| Answered | AAbutPier | #190965 | Question on seismic analysis (all girders integrated) | 33 | 2005-03-11 |
| Answered | AAbutPier | #190960 | Follow-up question on sole plate slope | 18 | 2005-03-10 |
| Answered | AAbutPier | #190955 | Attachment for 13515 · Currently viewing | 53 | 2005-03-10 |
| Answered | AAbutPier | #190952 | Entering profile ground elevation in ALINE | 62 | 2005-03-10 |
| Answered | AAbutPier | #190941 | Longitudinal slope when using basic alignment | 36 | 2005-03-10 |
| Answered | AAbutPier | #190935 | Seismic model generation | 37 | 2005-03-10 |
| Answered | AAbutPier | #190946 | Please check this | 37 | 2005-03-09 |
| Answered | AAbutPier | #190940 | Using basic alignment in seismic analysis | 34 | 2005-03-09 |