AnsweredAAbutPierQ&A #1902872005-01-20 06:40 · Views 18

About abutment

첨부된 파일을 보시면 단면도제원에서는 기초교축방향폭이 9.2m인데 기초부 설정에서는 8.510m로 나옵니다. 확인부탁드립니다. 그리고 기초 교축직각방향폭원을 구체폭과 다르게 주고싶습니다. 즉 첨부된 파일에서 10.9m인데 기초만 12.9m로 하고 싶은데 어떻게 해야하나요?

Answer

안녕하세요. 한길아이티입니다. 1. 기초부설정에서의 치수표기는 수정하여 패치에 적용하도록 하겠습니다. 2. 교축직각방향의 폭의 교대폭보다 연장하시려면 [교대입력]-[평면도 제원]에서 "dL""dR"값을 입력하시면 됩니다. 각각 좌우측으로 기초의 폭을 연장하여 줍니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#190287About abutment · Currently viewing182005-01-20
AnsweredAAbutPier#190286Multi-column pier92005-01-20
AnsweredAAbutPier#190278Abutment body quantity232005-01-20
AnsweredAAbutPier#190266File will not open232005-01-19
AnsweredAAbutPier#190265Question about the structural calculation report312005-01-19
AnsweredAAbutPier#190263Questions about the abutment132005-01-19
AnsweredAAbutPier#190256Error in pier foundation design162005-01-19
AnsweredAAbutPier#190252Possible error in abutment 2 reinforcement drawing242005-01-19
AnsweredAAbutPier#190251Error in calculation report figures222005-01-18
AnsweredAAbutPier#190247Separate up and down lines502005-01-18
AnsweredAAbutPier#190243Please check562005-01-18
AnsweredAAbutPier#190238Drawing output392005-01-18
AnsweredAAbutPier#190237Error during seismic analysis562005-01-18
AnsweredAAbutPier#190235Error with separate up/down line bridge452005-01-18
AnsweredAAbutPier#190257Question about the sole plate table162005-01-18
AnsweredAAbutPier#190240Error in surcharge load in abutment design settings422005-01-18
AnsweredAAbutPier#190236Uploading the Excel file as well472005-01-18
AnsweredAAbutPier#190227Question about seismic design and abutment and pier sections392005-01-18
AnsweredAAbutPier#190221Please check the quantities602005-01-17
AnsweredAAbutPier#190220A question and a request622005-01-17
Sign in to ask