Separate up and down lines

다시올립니다.

Answer

안녕하세요. 한길아이티입니다. 파일을 첨부하니 참조하시기 바랍니다. 참고 곡선사교에서 수정한 받침 좌표를 사용한 경우 [일반입력]-[기초자료]-"설계환경"에서 "교대 곡선사교인 경우 사거리 선형계산"을 변경하여 주셔야 합니다. 첨부한 파일에서는 변경하여 적용하였습니다. 감사합니다.

Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#190287About abutment182005-01-20
AnsweredAAbutPier#190286Multi-column pier92005-01-20
AnsweredAAbutPier#190278Abutment body quantity232005-01-20
AnsweredAAbutPier#190266File will not open232005-01-19
AnsweredAAbutPier#190265Question about the structural calculation report312005-01-19
AnsweredAAbutPier#190263Questions about the abutment132005-01-19
AnsweredAAbutPier#190256Error in pier foundation design162005-01-19
AnsweredAAbutPier#190252Possible error in abutment 2 reinforcement drawing242005-01-19
AnsweredAAbutPier#190251Error in calculation report figures222005-01-18
AnsweredAAbutPier#190247Separate up and down lines · Currently viewing502005-01-18
AnsweredAAbutPier#190243Please check562005-01-18
AnsweredAAbutPier#190238Drawing output392005-01-18
AnsweredAAbutPier#190237Error during seismic analysis562005-01-18
AnsweredAAbutPier#190235Error with separate up/down line bridge452005-01-18
AnsweredAAbutPier#190257Question about the sole plate table162005-01-18
AnsweredAAbutPier#190240Error in surcharge load in abutment design settings422005-01-18
AnsweredAAbutPier#190236Uploading the Excel file as well472005-01-18
AnsweredAAbutPier#190227Question about seismic design and abutment and pier sections392005-01-18
AnsweredAAbutPier#190221Please check the quantities602005-01-17
AnsweredAAbutPier#190220A question and a request622005-01-17
Sign in to ask