Skip to content
AnsweredAAbutPierQ&A #1902352005-01-18 18:52 · Views 45

Error with separate up/down line bridge

전화드렸습니다. 파일올립니다(슈좌표,*.APR)

Answer

안녕하세요. 한길아이티입니다. 확인한 바 이상이 없습니다. 확인은 EXCEL의 좌표를 각각의 방향에 입력한 후에 적용하여서 했습니다. 다시 확인해 주시고 이상이 있으시면 전화주시기 바랍니다. ([개인정보], [한길 담당자]) 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#190287About abutment182005-01-20
AnsweredAAbutPier#190286Multi-column pier92005-01-20
AnsweredAAbutPier#190278Abutment body quantity232005-01-20
AnsweredAAbutPier#190266File will not open232005-01-19
AnsweredAAbutPier#190265Question about the structural calculation report312005-01-19
AnsweredAAbutPier#190263Questions about the abutment132005-01-19
AnsweredAAbutPier#190256Error in pier foundation design162005-01-19
AnsweredAAbutPier#190252Possible error in abutment 2 reinforcement drawing242005-01-19
AnsweredAAbutPier#190251Error in calculation report figures222005-01-18
AnsweredAAbutPier#190247Separate up and down lines502005-01-18
AnsweredAAbutPier#190243Please check562005-01-18
AnsweredAAbutPier#190238Drawing output392005-01-18
AnsweredAAbutPier#190237Error during seismic analysis562005-01-18
AnsweredAAbutPier#190235Error with separate up/down line bridge · Currently viewing452005-01-18
AnsweredAAbutPier#190257Question about the sole plate table162005-01-18
AnsweredAAbutPier#190240Error in surcharge load in abutment design settings422005-01-18
AnsweredAAbutPier#190236Uploading the Excel file as well472005-01-18
AnsweredAAbutPier#190227Question about seismic design and abutment and pier sections392005-01-18
AnsweredAAbutPier#190221Please check the quantities602005-01-17
AnsweredAAbutPier#190220A question and a request622005-01-17
Sign in to ask