Regarding post no. 12616
12616 번호 문의사항과 관련하여 도각 화일을 첨부하여 드립니다. 바쁘시겠지만....부탁드리겠습니다. 도각 화일로 전환 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 변환하여 저장한 DWG 파일을 첨부합니다. 나머지 파일도 이파일을 이용하여 제작하시면 될것 같습니다. 참고로 수정된 항목은 다음과 같습니다. 1. MTEXT 를 EXPLODE 시킴 2. ELLIPSE HACH를 EXPLODE 시킴 3. PURGE 함 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #190149 | Seismic analysis modeling of a bridge with separated girders and slab | 49 | 2005-01-12 |
| Answered | AAbutPier | #190147 | Please fix the error | 41 | 2005-01-12 |
| Answered | AAbutPier | #190142 | Seismic analysis output | 51 | 2005-01-12 |
| Answered | AAbutPier | #190140 | About widened bridges | 21 | 2005-01-12 |
| Answered | AAbutPier | #190153 | Regarding post no. 12616 · Currently viewing | 35 | 2005-01-12 |
| Answered | AAbutPier | #190145 | Stability check of an abutment on a mass foundation | 67 | 2005-01-12 |
| Answered | AAbutPier | #190138 | Shear check of approach slab | 36 | 2005-01-12 |
| Answered | AAbutPier | #190135 | Abutment wing wall reinforcement detailing | 43 | 2005-01-12 |
| Answered | AAbutPier | #190132 | Pier at expansion joint | 33 | 2005-01-12 |
| Answered | AAbutPier | #190129 | Foundation rebar specification issue | 42 | 2005-01-12 |
| Answered | AAbutPier | #190128 | Error in bearing section when printing pier calculation report | 34 | 2005-01-12 |
| Answered | AAbutPier | #190134 | Load calculation for pier structural analysis | 66 | 2005-01-12 |
| Answered | AAbutPier | #190125 | Pier at expansion joint | 31 | 2005-01-12 |
| Answered | AAbutPier | #190114 | *** please check | 23 | 2005-01-11 |
| Answered | AAbutPier | #190119 | Abutment braking load | 51 | 2005-01-11 |
| Answered | AAbutPier | #190118 | Please check pile shear stress | 46 | 2005-01-11 |
| Answered | AAbutPier | #190116 | About IPC | 43 | 2005-01-11 |
| Answered | AAbutPier | #190115 | Pile centroid load in abutment structural calculation report | 98 | 2005-01-11 |
| Answered | AAbutPier | #190109 | Single-span continuous bridge fails with different girder counts | 23 | 2005-01-11 |
| Answered | AAbutPier | #190110 | Drawing frame is not generated correctly | 9 | 2005-01-11 |