Error when placing ties in P2 column
수고하십니다. 질문 1 : 첨부한 자료의 기둔부 띠철근 배치시 교각 2(지점 3)에서 다운이됩니다. 문제점을 알려주세요. 질문 2 : 교각3 (지점4)에서 본선교량 (ST. Box 2-cell)과 램프교량 (ST. Box 1-cell)로 나뉘어야 하는데 그렇게 적용할 수 있는 지 알고싶습니다. 지금은 지점4의 후면이 3-cell짜리 한교량으로 입력되어있습니다.
Answer
안녕하세요. 한길아이티입니다. 1. 수정하여 14일자 패치에 적용하였습니다. 2. 전화로 말씀드렸습니다. 감사합니다.
Attachments on this post were deleted after the retention period (3 years after the last answer) and can no longer be downloaded. If you need the same material, please contact us.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #189685 | Curved treatment at bottom of pier cap | 12 | 2004-12-14 |
| Answered | AAbutPier | #189678 | Cannot modify abutment height | 19 | 2004-12-14 |
| Answered | AAbutPier | #189694 | Shear check of abutment front face | 52 | 2004-12-14 |
| Answered | AAbutPier | #189691 | About setting shoe direction | 29 | 2004-12-14 |
| Answered | AAbutPier | #189682 | Abutment shear force calculation | 17 | 2004-12-14 |
| Answered | AAbutPier | #189680 | Structural calculation report error | 23 | 2004-12-14 |
| Answered | AAbutPier | #189675 | Error when placing ties in P2 column · Currently viewing | 24 | 2004-12-14 |
| Answered | AAbutPier | #189673 | Drawing generation error | 19 | 2004-12-14 |
| Answered | AAbutPier | #189666 | Please check automatic girder placement | 19 | 2004-12-14 |
| Answered | AAbutPier | #189664 | Quantity calculation report error | 10 | 2004-12-14 |
| Answered | AAbutPier | #189674 | About layers | 24 | 2004-12-13 |
| Answered | AAbutPier | #189658 | [Personal info] Please check | 30 | 2004-12-13 |
| Answered | AAbutPier | #189654 | Question about general quantities | 23 | 2004-12-13 |
| Answered | AAbutPier | #189668 | Applying individual footings to a pi-shaped pier | 20 | 2004-12-13 |
| Answered | AAbutPier | #189662 | Here is the drawing you requested | 17 | 2004-12-13 |
| Answered | AAbutPier | #189651 | About bridge bearings | 45 | 2004-12-13 |
| Answered | AAbutPier | #189645 | Question on bearing underside reinforcement calculation | 20 | 2004-12-11 |
| Answered | AAbutPier | #189641 | Shear force check | 21 | 2004-12-11 |
| Answered | AAbutPier | #189639 | Please check abutment wall height | 20 | 2004-12-10 |
| Answered | AAbutPier | #189642 | [HanGil contact] To the deputy manager: about coping | 27 | 2004-12-10 |