Skip to content
AnsweredAAbutPierQ&A #1895752004-12-09 02:33 · Views 37

When checking wing walls...

좌측날개벽 설계검토시 구간검토가 아닌것들이 뜨네요... 그리고 우측날개벽 설계검토시에는 철근을 바꾸어도 변하질 않는군요... 검토해주시믄 감사하겠습니다....

Answer

안녕하세요. 한길아이티입니다. 접속슬래브가 없는 경우 항목이 하나씩 잘못 출력되었습니다. (우측날개벽의 내용이 좌측날개벽입니다.) 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189635[HanGil contact] To the deputy manager: *** inquiry (reinforcement drawing)92004-12-10
AnsweredAAbutPier#189634File keeps crashing92004-12-10
AnsweredAAbutPier#189629Inquiry about abutment structural calculation report output272004-12-10
AnsweredAAbutPier#189621Document won't open82004-12-10
AnsweredAAbutPier#189628Coordinate values with multiple alignments292004-12-10
AnsweredAAbutPier#189627Inquiry about abutment earthwork quantities152004-12-10
AnsweredAAbutPier#189626Gwangam Bridge 1 related data 2112004-12-10
AnsweredAAbutPier#189616Cannot open document, please check432004-12-10
AnsweredAAbutPier#189607Error when generating drawings472004-12-10
AnsweredAAbutPier#189606Question about pile foundation452004-12-10
AnsweredAAbutPier#189603About starting load502004-12-10
AnsweredAAbutPier#189600Failed to open document492004-12-09
AnsweredAAbutPier#189618Uploading file with open error, please fix412004-12-09
AnsweredAAbutPier#189582Internal application error302004-12-09
AnsweredAAbutPier#189575When checking wing walls... · Currently viewing372004-12-09
AnsweredAAbutPier#189573Seismic load not applied after seismic analysis252004-12-09
AnsweredAAbutPier#189570*** second file352004-12-09
AnsweredAAbutPier#189586Error recovery352004-12-08
AnsweredAAbutPier#189574Agyang Bridge file dated December 3342004-12-08
AnsweredAAbutPier#189567Incorrect quantities for curved pier coping492004-12-08
Sign in to ask