Skip to content
AnsweredAAbutPierQ&A #1895742004-12-08 17:31 · Views 34

Agyang Bridge file dated December 3

검토바랍니다

Answer

안녕하세요. 한길아이티입니다. 선형까지 같이 적용된 파일입니다. 선형에 대한 내용은 12월3일자의 내용을 적용하였습니다. 감사합니다. 안녕하세요. 한길아이티입니다. 수정한 파일입니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189635[HanGil contact] To the deputy manager: *** inquiry (reinforcement drawing)92004-12-10
AnsweredAAbutPier#189634File keeps crashing92004-12-10
AnsweredAAbutPier#189629Inquiry about abutment structural calculation report output272004-12-10
AnsweredAAbutPier#189621Document won't open82004-12-10
AnsweredAAbutPier#189628Coordinate values with multiple alignments292004-12-10
AnsweredAAbutPier#189627Inquiry about abutment earthwork quantities152004-12-10
AnsweredAAbutPier#189626Gwangam Bridge 1 related data 2112004-12-10
AnsweredAAbutPier#189616Cannot open document, please check432004-12-10
AnsweredAAbutPier#189607Error when generating drawings472004-12-10
AnsweredAAbutPier#189606Question about pile foundation452004-12-10
AnsweredAAbutPier#189603About starting load502004-12-10
AnsweredAAbutPier#189600Failed to open document492004-12-09
AnsweredAAbutPier#189618Uploading file with open error, please fix412004-12-09
AnsweredAAbutPier#189582Internal application error302004-12-09
AnsweredAAbutPier#189575When checking wing walls...372004-12-09
AnsweredAAbutPier#189573Seismic load not applied after seismic analysis252004-12-09
AnsweredAAbutPier#189570*** second file352004-12-09
AnsweredAAbutPier#189586Error recovery352004-12-08
AnsweredAAbutPier#189574Agyang Bridge file dated December 3 · Currently viewing342004-12-08
AnsweredAAbutPier#189567Incorrect quantities for curved pier coping492004-12-08
Sign in to ask