Attachment for my [serviceability check - cracking] inquiry
입력파일과 생성된 교각 엑셀파일입니다. 두부보 검토에서 보면 주철근 개수는 87개인데 117개로 나누어 계산되어 있습니다. 그럼, 수고하세요.
Answer
안녕하세요. 한길아이티입니다. 두부보배근입력시 입력데이타에 2Cycle철근이 잘못 설정이 되었습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #189409 | Borehole log is not generated | 9 | 2004-12-02 |
| Answered | AAbutPier | #189407 | Pier calculation - uplift and buoyancy - column section values | 31 | 2004-12-02 |
| Answered | AAbutPier | #189417 | Attachment for my [serviceability check - cracking] inquiry · Currently viewing | 6 | 2004-12-01 |
| Answered | AAbutPier | #189399 | Error in pier modeling analysis | 45 | 2004-12-01 |
| Answered | AAbutPier | #189416 | Question about the bearing check in the pier calculation Excel sheet | 13 | 2004-12-01 |
| Answered | AAbutPier | #189408 | Inquiry about [serviceability check - cracking] | 15 | 2004-12-01 |
| Answered | AAbutPier | #189396 | Internal application error during pier modeling analysis | 31 | 2004-12-01 |
| Answered | AAbutPier | #189382 | Inquiry | 43 | 2004-12-01 |
| Answered | AAbutPier | #189381 | Applying stepped rebar to pier cap beam | 38 | 2004-12-01 |
| Answered | AAbutPier | #189380 | Error when generating abutment (side-wall wing wall) drawings | 34 | 2004-12-01 |
| Answered | AAbutPier | #189377 | This is Yeowon Bridge 2 | 30 | 2004-12-01 |
| Answered | AAbutPier | #189376 | Analysis result summary for mass foundation | 67 | 2004-11-30 |
| Answered | AAbutPier | #189372 | Abutment check (pile foundation) | 33 | 2004-11-30 |
| Answered | AAbutPier | #189393 | Semi-gravity abutment | 35 | 2004-11-30 |
| Answered | AAbutPier | #189366 | Edge distance | 68 | 2004-11-30 |
| Answered | AAbutPier | #189368 | Question about beam layout | 38 | 2004-11-30 |
| Answered | AAbutPier | #189367 | Dimensions on general drawing | 51 | 2004-11-30 |
| Answered | AAbutPier | #189358 | Please review | 21 | 2004-11-30 |
| Answered | AAbutPier | #189364 | Structural calculation report not output for pier calculation | 27 | 2004-11-29 |
| Answered | AAbutPier | #189360 | Wing wall haunch rebar check | 26 | 2004-11-29 |