Semi-gravity abutment
반중력식에서 앞굽쪽에만 슬로프를 두고 싶습니다... bh1 입력시 앞굽과 뒷굽이 모두 적용되어 불가 합니다..
Answer
안녕하세요. 한길아이티입니다. 현재 지원하고 있습니다. "교대 추가입력 선택" 버튼을 선택하신후 원하는 모양을 체크하신후 (가장 우측) BH2B, BH2F 값을 조정하시면 됩니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | AAbutPier | #189409 | Borehole log is not generated | 9 | 2004-12-02 |
| Answered | AAbutPier | #189407 | Pier calculation - uplift and buoyancy - column section values | 31 | 2004-12-02 |
| Answered | AAbutPier | #189417 | Attachment for my [serviceability check - cracking] inquiry | 6 | 2004-12-01 |
| Answered | AAbutPier | #189399 | Error in pier modeling analysis | 45 | 2004-12-01 |
| Answered | AAbutPier | #189416 | Question about the bearing check in the pier calculation Excel sheet | 13 | 2004-12-01 |
| Answered | AAbutPier | #189408 | Inquiry about [serviceability check - cracking] | 15 | 2004-12-01 |
| Answered | AAbutPier | #189396 | Internal application error during pier modeling analysis | 31 | 2004-12-01 |
| Answered | AAbutPier | #189382 | Inquiry | 43 | 2004-12-01 |
| Answered | AAbutPier | #189381 | Applying stepped rebar to pier cap beam | 38 | 2004-12-01 |
| Answered | AAbutPier | #189380 | Error when generating abutment (side-wall wing wall) drawings | 34 | 2004-12-01 |
| Answered | AAbutPier | #189377 | This is Yeowon Bridge 2 | 30 | 2004-12-01 |
| Answered | AAbutPier | #189376 | Analysis result summary for mass foundation | 67 | 2004-11-30 |
| Answered | AAbutPier | #189372 | Abutment check (pile foundation) | 33 | 2004-11-30 |
| Answered | AAbutPier | #189393 | Semi-gravity abutment · Currently viewing | 35 | 2004-11-30 |
| Answered | AAbutPier | #189366 | Edge distance | 68 | 2004-11-30 |
| Answered | AAbutPier | #189368 | Question about beam layout | 38 | 2004-11-30 |
| Answered | AAbutPier | #189367 | Dimensions on general drawing | 51 | 2004-11-30 |
| Answered | AAbutPier | #189358 | Please review | 21 | 2004-11-30 |
| Answered | AAbutPier | #189364 | Structural calculation report not output for pier calculation | 27 | 2004-11-29 |
| Answered | AAbutPier | #189360 | Wing wall haunch rebar check | 26 | 2004-11-29 |