Analysis result summary for mass foundation

[회사]..구조부 [개인정보] [전화] [개인정보] 안정검토시 지지력 최대값과 해석결과요약값이 다릅니다.

Answer

안녕하세요. 한길아이티입니다. 수정하였습니다. 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189409Borehole log is not generated92004-12-02
AnsweredAAbutPier#189407Pier calculation - uplift and buoyancy - column section values312004-12-02
AnsweredAAbutPier#189417Attachment for my [serviceability check - cracking] inquiry62004-12-01
AnsweredAAbutPier#189399Error in pier modeling analysis452004-12-01
AnsweredAAbutPier#189416Question about the bearing check in the pier calculation Excel sheet132004-12-01
AnsweredAAbutPier#189408Inquiry about [serviceability check - cracking]152004-12-01
AnsweredAAbutPier#189396Internal application error during pier modeling analysis312004-12-01
AnsweredAAbutPier#189382Inquiry432004-12-01
AnsweredAAbutPier#189381Applying stepped rebar to pier cap beam382004-12-01
AnsweredAAbutPier#189380Error when generating abutment (side-wall wing wall) drawings342004-12-01
AnsweredAAbutPier#189377This is Yeowon Bridge 2302004-12-01
AnsweredAAbutPier#189376Analysis result summary for mass foundation · Currently viewing672004-11-30
AnsweredAAbutPier#189372Abutment check (pile foundation)332004-11-30
AnsweredAAbutPier#189393Semi-gravity abutment352004-11-30
AnsweredAAbutPier#189366Edge distance682004-11-30
AnsweredAAbutPier#189368Question about beam layout382004-11-30
AnsweredAAbutPier#189367Dimensions on general drawing512004-11-30
AnsweredAAbutPier#189358Please review212004-11-30
AnsweredAAbutPier#189364Structural calculation report not output for pier calculation272004-11-29
AnsweredAAbutPier#189360Wing wall haunch rebar check262004-11-29
Sign in to ask