Mortar top elevation mismatch in abutment general drawing

교대일반도에 정면도에 있는 EL.과 하단에 있는 테이블의 EL이 안맞습니다.

Answer

안녕하세요. 한길아이티입니다. 정면도에 표현된 EL이 반올림등의 오차가 발생하는 경우가 있습니다. 수정하였으며 금일자 패치에 적용하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189352Mortar top elevation mismatch in abutment general drawing · Currently viewing402004-11-29
AnsweredAAbutPier#189348To *** (HanGil manager) - *** inquiry242004-11-29
AnsweredAAbutPier#189345Seismic modeling272004-11-29
AnsweredAAbutPier#189341Question about wing wall rebar282004-11-27
AnsweredAAbutPier#189337Pier edge distance142004-11-26
AnsweredAAbutPier#189331Questions on pier calculation332004-11-26
AnsweredAAbutPier#189330Question about pile bearing capacity152004-11-26
AnsweredAAbutPier#189327Please check the quantities242004-11-26
AnsweredAAbutPier#189328Please review242004-11-26
AnsweredAAbutPier#189325About the calculation report342004-11-25
AnsweredAAbutPier#189314Correction needed in bridge bearing check162004-11-25
AnsweredAAbutPier#189313Please check242004-11-25
AnsweredAAbutPier#189307[HanGil staff] Drawing for ***562004-11-25
AnsweredAAbutPier#189304Problem with pier reinforcement drawing92004-11-25
AnsweredAAbutPier#189295Bearing seat dimensions: automatic alignment reference?162004-11-25
AnsweredAAbutPier#189299Please review applying seismic analysis data to the pier calculation report232004-11-24
AnsweredAAbutPier#189294Please review172004-11-24
AnsweredAAbutPier#189291About MPL392004-11-24
AnsweredAAbutPier#189286***292004-11-24
AnsweredAAbutPier#189287Yeowon 2 Bridge profile and plan drawing342004-11-23
Sign in to ask