Skip to content
AnsweredAAbutPierQ&A #1892912004-11-24 10:08 · Views 39

About MPL

mpl값을 보니 여기서 단면 1에서 8번까지 같은 값으로 나오는데 단면이 강재의 두께가 다른데 어떻게 같게 나오는지 그리고 w1은 거더중량과 슬래브중량이라고 하고 w2(방호벽,중분대)와 w3(포장)의 값은 0으로 나오는데 확인요망

Answer

안녕하세요. 한길아이티입니다. 전화로 말씀드렸습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189352Mortar top elevation mismatch in abutment general drawing402004-11-29
AnsweredAAbutPier#189348To *** (HanGil manager) - *** inquiry242004-11-29
AnsweredAAbutPier#189345Seismic modeling272004-11-29
AnsweredAAbutPier#189341Question about wing wall rebar282004-11-27
AnsweredAAbutPier#189337Pier edge distance142004-11-26
AnsweredAAbutPier#189331Questions on pier calculation332004-11-26
AnsweredAAbutPier#189330Question about pile bearing capacity152004-11-26
AnsweredAAbutPier#189327Please check the quantities242004-11-26
AnsweredAAbutPier#189328Please review242004-11-26
AnsweredAAbutPier#189325About the calculation report342004-11-25
AnsweredAAbutPier#189314Correction needed in bridge bearing check162004-11-25
AnsweredAAbutPier#189313Please check242004-11-25
AnsweredAAbutPier#189307[HanGil staff] Drawing for ***562004-11-25
AnsweredAAbutPier#189304Problem with pier reinforcement drawing92004-11-25
AnsweredAAbutPier#189295Bearing seat dimensions: automatic alignment reference?162004-11-25
AnsweredAAbutPier#189299Please review applying seismic analysis data to the pier calculation report232004-11-24
AnsweredAAbutPier#189294Please review172004-11-24
AnsweredAAbutPier#189291About MPL · Currently viewing392004-11-24
AnsweredAAbutPier#189286***292004-11-24
AnsweredAAbutPier#189287Yeowon 2 Bridge profile and plan drawing342004-11-23
Sign in to ask