AnsweredAAbutPierQ&A #1890222004-11-09 16:31 · Views 32

Question about earthwork quantities

수고가 많으십니다. 1. 지반고가 계획고보다 높을시 뒷채움 삽도(빗금친부분)가 지반고 까지 올라갑니다.(수량 엑셀참고) 2. 뒷채움 결과값은 맞는것 같은데 산출 근거에서 공제 값을 물고 오지 못하는것 같읍니다. 3. 삽도상에서 포장,노상,노체 순서가 이상하고 그래서 수량도 이상한 것 같읍니다. 4. 천체적으로 삽도 업데이트 부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 답변이 늦어서 죄송합니다. 올려주신 문제에 대해서 수정중이며, 금일자 패치에 반영하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#189031Request to check structural unit weight in seismic calculation report192004-11-10
AnsweredAAbutPier#189030Error in wing wall quantity calculation542004-11-10
AnsweredAAbutPier#189026Step rebar error182004-11-10
AnsweredAAbutPier#189024Rebar numbers not shown on abutment reinforcement drawing312004-11-10
AnsweredAAbutPier#189018Pier foundation reinforcement122004-11-10
AnsweredAAbutPier#189015Follow-up to phone inquiry152004-11-09
AnsweredAAbutPier#189023Cannot merge two bridges separated by an expansion joint132004-11-09
AnsweredAAbutPier#189022Question about earthwork quantities · Currently viewing322004-11-09
AnsweredAAbutPier#189014Can scaffolding and shoring quantity reference positions be separated?222004-11-09
AnsweredAAbutPier#189009About pier footing reinforcement detailing232004-11-09
AnsweredAAbutPier#189004Check for horizontal force on coping282004-11-09
AnsweredAAbutPier#189003Please review232004-11-09
AnsweredAAbutPier#189000Inquiry about abutment bearing seat elevation242004-11-09
AnsweredAAbutPier#188989Reinforcement range for bearing concrete432004-11-08
AnsweredAAbutPier#188998About horizontal force from the superstructure732004-11-08
AnsweredAAbutPier#188997Inquiry about checking longitudinal web splices232004-11-08
AnsweredAAbutPier#188995Reinforcing rebar for bridge bearing concrete172004-11-08
AnsweredAAbutPier#188986Bearing seat reinforcement detailing262004-11-07
AnsweredAAbutPier#188982PSC bridge on a downward-sloping vertical curve342004-11-06
AnsweredAAbutPier#188981Column tie rebar arrangement282004-11-06
Sign in to ask