AnsweredAAbutPierQ&A #1888942004-11-03 20:20 · Views 6

Shoe arrangement order seems different

입력시 상부 하중은 교량 진행방향을 기준으로 좌측 부터 하중 값을 재하하고 일반도 (정면) 교좌면 EL. 값도 좌측이 1번 shoe로 정의가 되는데... 교좌면 제원에 와서는 교량 진행방향을 기준으로 우측 부터가 1번 shoe가 되더라구요.. 솔플레이트 값 역시 우측이 1번 shoe가 되는데... 통일 되어야 하지 않나요... 종점측은 다른 것을 보니 맞는것 같습니다... 확인 부탁드립니다...

Answer

안녕하세요. 한길아이티입니다. 교좌면은 입력시에는 교대 정면을 기준으로 좌측이 1번으로, 도면에서는 교량 진행방향의 좌측이 1번으로 지정되어 있습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#188906Column tie rebar input172004-11-04
AnsweredAAbutPier#188905Please check bearing stiffness values112004-11-04
AnsweredAAbutPier#188904Quantity report output takes too long, file attached172004-11-04
AnsweredAAbutPier#188901Abutment bridge bearing reinforcing rebar302004-11-04
AnsweredAAbutPier#188899Please check cross slope of skewed abutment52004-11-04
AnsweredAAbutPier#188898Seismic analysis field is not enabled62004-11-03
AnsweredAAbutPier#188894Shoe arrangement order seems different · Currently viewing62004-11-03
AnsweredAAbutPier#188890How are dimensions calculated in the illustrations?42004-11-03
AnsweredAAbutPier#188902File for seismic design92004-11-03
AnsweredAAbutPier#188900[Personal information] Please check62004-11-03
AnsweredAAbutPier#188893About the program122004-11-03
AnsweredAAbutPier#188888Abutment structural calculation report - 4. Wall design error in section design82004-11-03
AnsweredAAbutPier#188878Seismic column section problem42004-11-03
AnsweredAAbutPier#188875*** File for the inquiry made by phone82004-11-03
AnsweredAAbutPier#188873Illustration error in quantity calculation report92004-11-03
AnsweredAAbutPier#188869***, please check the wing wall drawing112004-11-02
AnsweredAAbutPier#188867Internal program error?382004-11-02
AnsweredAAbutPier#188844Earthwork summary table does not match calculation basis292004-11-02
AnsweredAAbutPier#188858Front wing wall input472004-11-01
AnsweredAAbutPier#188845Question about scaffolding ladder quantity202004-11-01