AnsweredAAbutPierQ&A #1888732004-11-03 01:56 · Views 9

Illustration error in quantity calculation report

수량산출서의 삽도가 너무작게 나옵니다. 확인부탁드립니다.

Answer

안녕하세요. 한길아이티입니다. 삽도에는 원지반 EL이 그려지는데, 현재 설정되어 있는 원지반 EL 이 교대나 교각과 차이가 너무 많이 나서 생긴 현상입니다. 원지반 EL을 입력하신 후, 다시 출력 해 보시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#188906Column tie rebar input172004-11-04
AnsweredAAbutPier#188905Please check bearing stiffness values112004-11-04
AnsweredAAbutPier#188904Quantity report output takes too long, file attached172004-11-04
AnsweredAAbutPier#188901Abutment bridge bearing reinforcing rebar302004-11-04
AnsweredAAbutPier#188899Please check cross slope of skewed abutment52004-11-04
AnsweredAAbutPier#188898Seismic analysis field is not enabled62004-11-03
AnsweredAAbutPier#188894Shoe arrangement order seems different62004-11-03
AnsweredAAbutPier#188890How are dimensions calculated in the illustrations?42004-11-03
AnsweredAAbutPier#188902File for seismic design92004-11-03
AnsweredAAbutPier#188900[Personal information] Please check62004-11-03
AnsweredAAbutPier#188893About the program122004-11-03
AnsweredAAbutPier#188888Abutment structural calculation report - 4. Wall design error in section design82004-11-03
AnsweredAAbutPier#188878Seismic column section problem42004-11-03
AnsweredAAbutPier#188875*** File for the inquiry made by phone82004-11-03
AnsweredAAbutPier#188873Illustration error in quantity calculation report · Currently viewing92004-11-03
AnsweredAAbutPier#188869***, please check the wing wall drawing112004-11-02
AnsweredAAbutPier#188867Internal program error?382004-11-02
AnsweredAAbutPier#188844Earthwork summary table does not match calculation basis292004-11-02
AnsweredAAbutPier#188858Front wing wall input472004-11-01
AnsweredAAbutPier#188845Question about scaffolding ladder quantity202004-11-01
Sign in to ask