Skip to content
AnsweredAAbutPierQ&A #1887822004-10-29 00:37 · Views 28

Question about abutment rebar summary

교대철근집계를 본체와 날개벽, 접속슬래브로 구분하여 집계를 하였으면 좋겠습니다.

Answer

안녕하세요. 한길아이티입니다. 현재 본체(날개벽 포함)와 접속슬래브만 구분이 되어 적용되어 있습니다. 이 부분은 검토후 추후에 보완하도록 하겠습니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#188843About pier coping design202004-11-02
AnsweredAAbutPier#188836Error occurs in seismic analysis202004-11-01
AnsweredAAbutPier#188818Please check172004-11-01
AnsweredAAbutPier#188841Error when printing quantity calculation report342004-11-01
AnsweredAAbutPier#188832*** Details from my phone call202004-11-01
AnsweredAAbutPier#188827Possible issue in abutment bearing capacity stability check272004-11-01
AnsweredAAbutPier#188824Re-uploading182004-11-01
AnsweredAAbutPier#188819Where is the deep beam check?162004-11-01
AnsweredAAbutPier#188801Approach slab length292004-10-29
AnsweredAAbutPier#188799Cross beam section input502004-10-29
AnsweredAAbutPier#188795*** Please check the wing wall drawing752004-10-29
AnsweredAAbutPier#188794Seismic section input, starting from cross beam input462004-10-29
AnsweredAAbutPier#188792Entering cross beams for seismic section262004-10-29
AnsweredAAbutPier#188789Pier calculation report output error332004-10-29
AnsweredAAbutPier#188784Internal error after update212004-10-29
AnsweredAAbutPier#188782Question about abutment rebar summary · Currently viewing282004-10-29
AnsweredAAbutPier#188781[***] Uploading attached file422004-10-29
AnsweredAAbutPier#188779Please check182004-10-29
AnsweredAAbutPier#188788About railway loads252004-10-28
AnsweredAAbutPier#188780Pier calculation report output error362004-10-28
Sign in to ask