Skip to content
AnsweredAAbutPierQ&A #1886832004-10-26 00:43 · Views 23

Question about the pile calculation report (2)

apier입력 화일을 올립니다.

Answer

안녕하세요. 한길아이티입니다. 단면도 제원에서 "지반정보 표시"에서 확인하여 보시면 2번째구간(N=19)는 기초지반위에 위치하므로 말뚝의 주면마찰력산정시 제외되는 것입니다. 확인하여 보시고 이상이 있으시면 게시판에 남겨주시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#188708Question about battered piles272004-10-26
AnsweredAAbutPier#188703Internal application error492004-10-26
AnsweredAAbutPier#188705Foundation shape262004-10-26
AnsweredAAbutPier#188695Abutment file322004-10-26
AnsweredAAbutPier#188691When calculating piers382004-10-26
AnsweredAAbutPier#188690Question about pile foundations282004-10-26
AnsweredAAbutPier#188683Question about the pile calculation report (2) · Currently viewing232004-10-26
AnsweredAAbutPier#188702About Mt and Mb in elastic and plastic design362004-10-25
AnsweredAAbutPier#188675Question about abutment elevation162004-10-25
AnsweredAAbutPier#188698Reference material on deep beam provisions492004-10-25
AnsweredAAbutPier#188697About abutment calculation report (railway)272004-10-25
AnsweredAAbutPier#188692Error in pier design check292004-10-25
AnsweredAAbutPier#188682Question about the pile calculation report172004-10-25
AnsweredAAbutPier#188676About gravity-type abutments152004-10-25
AnsweredAAbutPier#188672*** please check322004-10-25
AnsweredAAbutPier#188670Please check the bearing reaction summary (abutment)142004-10-24
AnsweredAAbutPier#188664Light rail line92004-10-23
AnsweredAAbutPier#188661Please check82004-10-23
AnsweredAAbutPier#188660About pier structural calculation182004-10-23
AnsweredAAbutPier#188658*** please check72004-10-23
Sign in to ask